Multi-Trade Exterior Building Sustainment (Masonry, Painting, and Gutter Repair) IDIQ – Grissom ARB
- Response deadline
- Sep 4, 2026 Due in 21 days
- Date posted
- Aug 14, 2026
- Source
- Open notice
Description
DESCRIPTION of WORK The Department of the Air Force, 434th Contracting Flight (434 CONF) at Grissom Air Reserve Base (ARB), Indiana, is soliciting proposals for a Single-Award Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Project CTGB 26-1000, Sustain Exteriors. The contractor shall provide all management, labor, tools, equipment, and materials necessary to execute multi-trade exterior facility sustainment base-wide. The core technical requirements are highly interdependent and include three primary disciplines: Masonry Sustainment: Brick replacement (Grissom and Venetian blends), tuckpointing, mortar joint repair, faux limestone concrete brick replacements, wall expansion joint repairs, and window perimeter caulking. Exterior Painting: Surface preparation (power washing, sanding, rust removal, and priming) and paint/coatings application on exterior doors, window metal trim, overhead doors, metal panels, and miscellaneous exterior woodwork. Gutter and Downspout Repair: Cleaning, joint-sealing (surface and built-in systems), patching, downspout additions/support brackets, releveling, and downspout raises. Project Milestones & Period of Performance: Contract Term: One (1) Base Year with up to four (4) additional 365-day Government Option Periods (Total ordering period up to 5 years). Task Order Performance: Individual task orders will specify performance periods, typically requiring work to begin within 14 calendar days and be completed within 90 calendar days from the Notice to Proceed (NTP). Note: In accordance with FAR 52.232-18 (Availability of Funds), funds are not presently available for this effort. No award will be made under this solicitation until O&M funds are formally certified. The Government reserves the right to cancel this solicitation before or after the closing date without obligation or reimbursement. Offerors must strictly adhere to the following schedule: Solicitation Release: August 14, 2026 Organized Site Visit: August 25, 2026, at 10:00 AM EDT. Location: Grissom Air Reserve Base, Indiana. Access: Offerors must coordinate base access in advance using the Grissom DBIDS procedures outlined in the solicitation packages. Deadline for Contractor Questions: August 28, 2026, at 10:00 AM EDT. Submission: Submit all technical and administrative questions via email directly to the Contracting Officer. Solicitation Close (Proposal Due Date): September 4, 2026, at 10:00 AM EDT. Acceptance Period: Offerors must agree to a minimum proposal acceptance period of 270 calendar days to facilitate technical evaluations and FY26/FY27 funding coordination.
Classifications
Documents (12)
- Grissom Air Reserve Base Standards.pdf.pdf7.9 MBNot yet available
- Financial Institution Reference Sheet.docx.docx37 KBNot yet available
- Proposal Price Worksheet - Price Analysis based on Estimated Workload.xlsx.xlsx22 KBNot yet available
- Davis-Bacon Act WD IN20260002 Mod 2_Building.pdf.pdf1.4 MBNot yet available
- Grissom DBIDS - How to Request Base Access.pdf.pdf585 KBNot yet available
- Grissom ARB Bio Identification and Notification.pdf.pdf203 KBNot yet available
- 261000 RSE DWG SET BASE YR.pdf.pdf5.2 MBNot yet available
- Service Contract Act WD 2015-4809 Mod 34.pdf.pdf470 KBNot yet available
- Performance Work Statement.pdf.pdf322 KBNot yet available
- Solicitation - FA465426R0008.pdf.pdf2.2 MBNot yet available
- 261000 RSE DWG Option Tasks.pdf.pdf7.0 MBNot yet available
- Grissom ARB Environmental Requirements.docx.docx35 KBNot yet available
Contacts
- cedric.roberts@us.af.mil7656882818
Similar contracts
- Z--Install new masonry barrier wall to include excavaDue Sep 3, 2026
- Snow Shelter Doors Removal & Replacement at NEXRADDue Aug 26, 2026
- Arlington National Cemetery Boundary Wall Repairs Phase 6VirginiaDue Sep 4, 2026
- Gatehouse Chimney Demolition and Reconstruction, Union Village Dam, East Thetford, VTDue Aug 20, 2026
- Exterior Repairs to Wooten Hall - Las Cruces, NMNew MexicoDue Sep 3, 2026
- Y1DZ--Repair Masonry / Structural Issues | 659-24-901Due Aug 18, 2026