Sanitary Sewer Extension at 646 S. Hamilton Street in the City of Gary, IN
- Response deadline
- Jul 16, 2026 Closed
- Date posted
- Jun 22, 2026
- Source
- Open notice
Description
The Scope of work shall include the following: MANHOLE REPLACEMENT Install new 8-inch diameter PVC SDR 35 ± 215-linear feet from Manhole No. 588 to new Manhole No. 588A.Install new 8-inch diameter PVC SDR 35 ± 215-linear feet from Manhole No. 588A to new Manhole No. 588B. Install two (2) new 4-foot diameter precast Manholes, No. 588A and No. 588B, complete with copolymer polypropylene plastic steps ALTERNATIVE 2: East 7 th Avenue Install new 8-inch diameter PVC SDR 35 ± 200-linear feet from Manhole No. 585 to new Manhole No. 585A.Install new 8-inch diameter PVC SDR 35 ± 200-linear feet from Manhole No. 585A to new Manhole No. 585B. Install two (2) new 4-foot diameter precast Manholes, No. 588A and No. 588B, complete with copolymer polypropylene plastic steps.
Documents
No documents posted for this opportunity.
Similar contracts
- Emergency Sanitary Sewer Repair at 8237 Lake Shore DriveINDue Oct 1, 2026
- Emergency Sanitary Sewer Repair at 8535 Lakewood Avenue in the City of Gary, ININDue Oct 1, 2026
- Request for Quotes for Sanitary Sewer Lining Project at 2100 West 2nd AvenueINDue Aug 20, 2026
- Request for Quote for Sanitary Sewer Lining at 501 West 37th Avenue, Gary, ININDue Aug 20, 2026
- Request for Quotes for Sanitary Sewer Lining at 612 East 5th Avenue, Gary, IndianaINDue Aug 20, 2026
- Emergency Sanitary Sewer Repair at 1824 West 20th Place in the City of Gary, ININDue Jul 16, 2026