Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveHC-26-02 / HC-0916
Open

Contract Resurface 26-02 - Various Roads in Jackson & Noblesville Townships

Response deadline
Aug 24, 2026
Due in 19 days
Date posted
Aug 3, 2026

Description

Asphalt milling and resurfacing of roads in Jackson and Noblesville Townships. Loc. No. Road Name Length (Mile) Start End Avg. Width (Feet) Milling Asphalt Resurface 1 211th St. 0.66 Mill Creek Rd. North Harbour Dr. 22 2" Surface Mill 2" 12.5mm, Type C, Surface Asphalt 2 Mill Creek Rd. 0.18 211th St. Dead End 13 Profile Mill 1.5" 9.5mm, Type B, Surface Asphalt 3 Point Ln. 1.38 249th St. South End of Point Ln. 24 2" Surface Mill Fabric, 2" W&L, 1.5" 9.5mm Surface Asphalt 4 Cherry Tree Rd. 0.43 171st St. 275' S. of Pleasant St. 20 2" Surface Mill 2" 12.5mm, Type C, Surface Asphalt 5 Bays Dr. 0.48 161st St. D.E. / cul-de-sac 24 1.5" Surface Mill 1.5" 9.5mm, Type B, Surface Asphalt 6 Susan Ct. 0.09 Bays Dr. D.E. / cul-de-sac 24 1.5" Surface Mill 1.5" 9.5mm, Type B, Surface Asphalt 7 Angela Ct. 0.06 Bays Dr. D.E. / cul-de-sac 24 1.5" Surface Mill 1.5" 9.5mm, Type B, Surface Asphalt TOTAL (mi.): 3.28 In addition, this contract will also include: 8" deep patching on Bays Dr., Cherry Tree Rd, and 211th St. Crack Seal transverse cracks on Point Lane post milling Installation of Petromat Enviro Pavement Fabric along all of Point Lane four (4) pipe replacements along Point Lane Curb and Casting replacements along Bays Dr. and Angela Ct. (Cherry Tree Farms subdivision) Inlet cleaning in the Cherry Farms subdivision (Bays Dr., Susan Ct., and Angela Ct.)

Documents

No documents posted for this opportunity.

Similar contracts

Explore more