Buskirk-Chumley Theater Solar & BESS Install Project
- Response deadline
- Oct 29, 2026 Due in 17 days
- Date posted
- Oct 12, 2026
- Source
- Open notice
Description
This project, titled ‘Buskirk-Chumley Theater Solar & BESS Install,’ shall include, but is not limited to, all labor, materials, equipment, permits, coordination, programming, testing, and incidental work necessary to furnish and install an operational electrical, lighting, building controls, and resiliency system in accordance with the contract drawings and specifications at the historic Buskirk-Chumley Theater, located in Bloomington, Indiana. The intent of this work is to provide a code-compliant, integrated electrical and Photovoltaic / Battery Energy Storage System (PV/BESS) resiliency system that supports safe building operation under normal conditions and utility outages while maintaining required life-safety, occupancy, and building protection functions. All work must follow the approved design plans, meet City of Bloomington's requirements, and be completed within the project’s established timeline and budget.
Documents
No documents posted for this opportunity.