ILWW M.S. Fabricated Steel Supply L&D
- Response deadline
- Aug 18, 2026 Closed
- Date posted
- Aug 3, 2026
- Source
- Open notice
Description
The US Army Corps of Engineers - Rock Island District intends to solicit for competitive quotations under Revolutionary FAR Overhaul (RFO) Part 12 for the following requirement. DISCLAIMER: THIS IS A PRE-SOLICITATION NOTICE. ANY INFORMATION OR SUBMITTALS RECEIVED IN RESPONSE TO THIS NOTICE WILL NOT BE EVALUATED AND WILL NOT BE CONSTRUED AS QUOTES. NO COMPENSATION FOR SUCH RESPONSES WILL BE MADE. DELIVERY LOCATION All items are to be delivered FOB Destination to the U.S. Army Corps of Engineers (USACE) Illinois Waterway Project Office, with a physical address of 257 Grant Street, Peoria, IL 61603. SUMMARY OF WORK The requirement is for the fabrication and supply of various steel components. The work includes, but is not limited to: Fabrication and supply of (4) Gudgeon Pins, (8) Keepers, and (2) Bushings. Fabrication and supply of (8) 9-inch Anchorage Pins with (8) Keepers (Dog Bone). Fabrication and supply of (2) Pintle Shoes. The contractor will be required to adhere to all specifications and drawings provided in the forthcoming solicitation, including requirements for specific ASTM-rated materials, 100% Non-Destructive Testing (UT & MT) with certified reports, specified paint systems (UFGS 09 97 02), and strict packaging and delivery protocols. The required delivery for all items is within 37 weeks after receipt of order (ARO).
Classifications
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Active Vehicle Barriers and Associated Control System at Osan Air BaseDue Oct 15, 2026
- Window, ObservationDue Oct 13, 2026
- Frame Section, StructurDue Oct 14, 2026
- Adapter, Straight, PiDue Oct 13, 2026
- Hose Assembly, NonmetalDue Oct 14, 2026
- Electron Storage Ring D2 Dipole MagnetsNew YorkDue Oct 14, 2026