556-25-102 Green House Homes Steam
- Response deadline
- Sep 23, 2026 Closed
- Date posted
- Aug 25, 2026
- Source
- Open notice
Description
Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project as described throughout the contract documents – including the drawings and specifications. The purpose of this project is to provide steam service to Green House Homes 201 and 202. Existing gas fired hot water boilers (2 per home) and gas fired steam generators (1 per home) are to be replaced. Steam-to-Hot Water heat exchangers will replace gas fired hot water boilers and clean steam duct mounted humidifiers will replace exiting setup. Both homes are anticipated to be occupied during work. Construction will be phased to reduce impact on residents and FHCC operations, see sheet MS100. Removal and installation of duct mounted humidifier will be a one-day event (per home) due to AHU shutdown. All material will be required to be on site, and interior of ductwork immediately near installation will be clean and free of debris prior to AHU being returned to service.
Classifications
Documents (7)
- S02 - 556-25-102_Greenhouse_Homes_Steam_100CD Dwgs 26SEP25_PART 1.pdf.pdf8.1 MBNot yet available
- S02 - Bldg. 3 Site Map.pdf.pdf230 KBNot yet available
- S02 - 556-25-102_Greenhouse_Homes_Steam_100CD Dwgs 26SEP25_PART 2.pdf.pdf14.0 MBNot yet available
- S02 - VA Notice of Limitations on Subcontracting.docx.docx16 KBNot yet available
- S02 - Wage Determination IL20260008 Mod02 05182026.pdf.pdf92 KBNot yet available
- 36C25226B0036_1 (2).docx.docx267 KBNot yet available
- S02 - 556-25-102_Greenhouse_Homes_Steam_100CD Specs 26SEP25.pdf.pdf3.2 MBNot yet available
Contacts
- Contracting Officerryan.mcmillin@va.gov(414) 844-4839
- Contractormelanie.dewing@va.gov406-373-3317
Similar contracts
- Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228IllinoisDue Oct 20, 2026
- TVHS AC VRF System InstallationTennesseeDue Oct 23, 2026
- Troubleshoot & Repair of Portable Chillers Service RequirementTexasDue Oct 22, 2026
- Cooling Water System Repair and Reliability ProjectDue Oct 26, 2026
- FY 2026 Preventive Maintenance Services to the Building Automation SystemEstuaireDue Oct 19, 2026
- Trane BAS HVAC Control System Inspection, Maintenance, Upgrades, and RepairWYDue Oct 28, 2026