Civic AI
Civic AI
Procurement intelligence
SAM.gov36C25226B0035-1
Open

556-26-2-6953-0001 - 556-24-108 Double Block and Bleed Construction

Response deadline
Sep 14, 2026
Closed
Date posted
Aug 19, 2026

Description

Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project as described throughout the contract documents – including the drawings and specifications. The purpose of this project is to enable complete and compliant isolation and de-energization of the steam supply and condensate return connections using a double block and bleed valve assembly at each entry and exit point of each of the 25 listed buildings.

Classifications

Documents (7)

  • S02 - VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx
    .docx16 KBNot yet available
  • 36C25226B0035_1.pdf
    .pdf648 KBNot yet available
  • P - 556-24-108 DBBV 100CD Drawings 29APR25.pdf
    .pdf8.8 MBNot yet available
  • S02 - Wage Determination IL20260008 Mod02 05182026.pdf
    .pdf92 KBNot yet available
  • S02 - 556-24-108 DBBV Addendum to Replace Select Div01 Specs 6JAN26.pdf
    .pdf1021 KBNot yet available
  • S02 - 556-24-108 DBBV 100CD Specifications 29APR25.pdf
    .pdf3.8 MBNot yet available
  • S02 - Bldg. 3 Site Map.pdf
    .pdf230 KBNot yet available

Contacts

Similar contracts

Explore more