REPAIR, Office Space B5000, 126ARW, Scott AFB
- Response deadline
- Aug 21, 2026 Due in 8 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
EDIT - 13 Aug 2026: To allow for additional questions/coordination, solicitation close is extended to 21 Aug 2026. EDIT - 11 Aug 2026: Two attachements containing HVAC plans for both levels of Bldg 5000 have been uploaded. Q&A updated. EDIT - 6 August 2026: Two attachments containing floorplans for both levels of Bldg 5000 have been uploaded. Q&A uploaded. EDIT - 31 July 2026: Amendment 0002 uploaded to list of attachments. EDIT - 23 July 2026: Site visit documentation and amendment 0001 to the solicitation has been posted. *********** The 126th Air Refueling Wing has a requirement for interior renovovations in the 126 Air Refueling Wing Headquarters building. Please refer to the attached document titled "Combined Synopsis-Solicitation_W50S7S26Q0016" for full details regarding this requirement. The attached document contains the complete Statement of RFO Compliance, Requirement Description, Line Item Structure (CLIN 0001), Site Visit Instructions, Bonds and Payment Protection information, and all applicable RFO Provisions and Clauses (including specific quote submission instructions and evaluation factors). Vendors must review the Combined Synopsis-Solicitation attachment and the Performance Work Statement (PWS) in their entirety prior to submitting a quote.
Classifications
Documents (10)
- Attachment 2 - Wage Determinations IL20260007_18 May 2026.pdf.pdf3.2 MBNot yet available
- Attachment 6_Bldg. 5000 Mechanical HVAC Floor Plans_2nd Floor.pdf.pdf332 KBNot yet available
- Vendor Sign-In Sheet_Redacted.pdf.pdf537 KBNot yet available
- Attachment 1 - PWS REPAIR Office Space.pdf.pdf562 KBNot yet available
- Attachment 5_Bldg. 5000 Mechanical HVAC Floor Plans_1st Floor.pdf.pdf5.0 MBNot yet available
- Attachment 3_Bldg 5000-1.pdf.pdf115 KBNot yet available
- Attachment 4_Bldg 5000-2.pdf.pdf102 KBNot yet available
- Q and A.docx.docx953 KBNot yet available
- Combined Synopsis-Solicitation_W50S7S26Q0016 0002.pdf.pdf97 KBNot yet available
- Site Visit MFR.pdf.pdf71 KBNot yet available
Contacts
Similar contracts
- EXTERIOR UPGRADE, FRANKFURTDue Aug 31, 2026
- Fort Benning Job Order Contract (JOC)GeorgiaDue Aug 26, 2026
- DB VEHICLE MAINTENANCE FACILITY, BASA AIR BASE, PHILIPPINES. Due Sep 14, 2026
- (SOL. Amendment) MATOC WP_W90VN726RA024_Repair Roof Contingency SQ Ops, B2548Due Aug 21, 2026
- 657-26-602 Create Observation Unit JCMissouriDue Sep 1, 2026
- AMENDMENT 0001 - 19KU2026Q0012: Chancery Annex Restroom, Lactation RM &Locker RMs RenovationḨawallīDue Aug 20, 2026