Civic AI
Civic AI
Procurement intelligence
SAM.govW50S7S26
Open

REPAIR Airfield Apron - 126 ARW, Scott AFB, IL

DEPT OF DEFENSE · Illinois
Response deadline
Sep 18, 2026
Due in 1 day
Date posted
Sep 17, 2026

Description

Amendment 6: Adding some clarifcations. Q1: The airfield markings scope says to reference UFC 3-260-04 Chapter 6 for standards. Within that guideline, there are several options listed under the material selection in Chap 6, Section 3-3.3. The types range from Type I, Type II, Type III, Type IVa & Type IVb. While Type I is the most common for this project application, will you please clarify which type is required for this project? A1: From researching the different glass bead options and receiving feedback from the Airfield Manager, the government is requesting that the contractors provide pricing for two options. The first is using Type I glass beads. The second is using Type III glass beads. Both of these options work with Type I, II, or III paints. Q2. Is there a place on 126th property where this waste can be dumped and staged for a short period to reduce the travel time of the vac truck? Or shall we plan on hauling everything off base right away? A2: With regards to a second question, the contractors can plan to use an area near the TDY parking lot to dump and stage removed paint debris from the vac truck. Loading out directly will not be necessary. Please see the uploaded screenshot of the TDY parking lot. Amendment 5: By request, uploading the offical site visit sign-in (this does not include those who attended ad hoc visits) Amendment 4: Added second round of questions and answers. Amendment 3: The correct Notice ID for this solicitation is W50S7S26Q0031. Please include this in the quote and subject line of any emails. Amendment 2: Calrifying that NO bid bonds are required. Amendment 1: Added grid and questions and answers. The 126 Air Refueling Wing has a requirement for comprehensive repairs to the concrete apron, asphalt shoulders, and airfield markings. Please refer to the attached document titled "Combined Synopsis-Solicitation_W50S7S26Q0031" for full details regarding this requirement. The attached document contains the Requirement Description, Line Item Structure, Site Visit Instructions, Submission Instructions, Evaluation Factors, and all applicable RFO Provisions and Clauses (including specific quote submission instructions and evaluation factors). Vendors must review the Combined Synopsis-Solicitation and all attachments in their entirety prior to submitting a quote.

Classifications

Documents (9)

  • tdy parking lot.png
    .png867 KBNot yet available
  • Q and A 2.docx
    .docx16 KBNot yet available
  • Site visit sign-in_Apron Repair.pdf
    .pdf226 KBNot yet available
  • Attachment 2 - DBA Wage Determinations IL20260017.pdf
    .pdf55 KBNot yet available
  • Combined Synopsis-Solicitation_W50S7S26Q0031.pdf
    .pdf87 KBNot yet available
  • Questions and Answers.docx
    .docx2.9 MBNot yet available
  • Attachment 3 - Clauses and Provisions.pdf
    .pdf79 KBNot yet available
  • Grid 9 JAN 2026.pptx
    .pptx1.6 MBNot yet available
  • Attachment 1 - Performance Work Statement.pdf
    .pdf743 KBNot yet available

Contacts

Similar contracts

Explore more