Civic AI
Civic AI
Procurement intelligence
SAM.gov378854_MR
Open

Pip-Ii F-37 Building Lwc Pump Room Piping System Installation

Response deadline
Nov 19, 2026
Due in 42 days
Date posted
Oct 8, 2026

Description

This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: Ocotber 27, 10:00a CDT Last Day for Questions: November 5, 2026, 4:00p CDT PROPOSALS DUE: November 19, 2026, 2:00p CDT To attend the Pre-Proposal Meeting and Site Visit, PPE is required. As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID. Please note that when entering Fermilab: All vehicles are subject to search No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site. No explosives or any other apparatus or material hazardous to the public or property are allowed on site. No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable. No personal alcohol or marijuana No Smoking or vaping within buildings and within 15-25 feet of entrances Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.

Classifications

Documents (25)

  • EXHIBIT_18_Injury_Illness_Questionaire.pdf
    .pdf113 KBNot yet available
  • EXHIBIT_14_Proposal Certifications.pdf
    .pdf406 KBNot yet available
  • EXHIBIT_7_ADDENDUM TO FESHM.pdf
    .pdf174 KBNot yet available
  • EXHIBIT_9_010010 General Requirements.pdf
    .pdf337 KBNot yet available
  • 378854_MR.pdf
    .pdf323 KBNot yet available
  • EXHIBIT_20_SF1413-23a.pdf
    .pdf189 KBNot yet available
  • EXHIBIT_24_Sample Subcontract.pdf
    .pdf209 KBNot yet available
  • EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf
    .pdf343 KBNot yet available
  • EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf
    .pdf320 KBNot yet available
  • EXHIBIT_13_CESHC.pdf
    .pdf428 KBNot yet available
  • EXHIBIT_6_5031_1 Piping Systems March 2025.pdf
    .pdf1.5 MBNot yet available
  • EXHIBIT_15_SARC.pdf
    .pdf471 KBNot yet available
  • EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf
    .pdf194 KBNot yet available
  • EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf
    .pdf754 KBNot yet available
  • EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf
    .pdf889 KBNot yet available
  • EXHIBIT_12_014100 Quality Requirements.pdf
    .pdf166 KBNot yet available
  • EXHIBIT_10_013100 ESH Requirements.pdf
    .pdf919 KBNot yet available
  • EXHIBIT_8_FESHM 5034 Pressure Testing.pdf
    .pdf512 KBNot yet available
  • EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf
    .pdf234 KBNot yet available
  • EXHIBIT_23_Performance Bond.pdf
    .pdf102 KBNot yet available
  • EXHIBIT_22_Payment Bond.pdf
    .pdf115 KBNot yet available
  • EXHIBIT_25_Drawings.zip
    .zip17.1 MBNot yet available
  • EXHIBIT_21_Bid_Bond.pdf
    .pdf115 KBNot yet available
  • EXHIBIT_17_FL-55.pdf
    .pdf392 KBNot yet available
  • EXHIBIT_11_013300 Submittals.pdf
    .pdf146 KBNot yet available

Contacts

Similar contracts

Explore more