MINOS High Bay Roof Replacement & Masonry Wall Repair
- Response deadline
- Oct 6, 2026 Due in 34 days
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
Fermi National Accelerator Laboratory (FNAL) is requesting proposals for the removal and replacement of one high bay roof and masonry wall repairs at the MINOS Service Building. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois. The project is in Kane County. Refer to the site map for the exact location of the MINOS Service Building. The Subcontractor shall furnish all required supervision, labor, materials, tools, and equipment necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications. For more detailed information, please review the attached SOW entitled, “MINOS High Bay Roof Replacement and Masonry Wall Repair.” Proposals are due 10/06/2026 at 5pm CT.
Classifications
Documents (20)
- Exhibit C FFDG General Terms and Conditions for Construction (08.2025).pdf.pdf325 KBNot yet available
- Exhibit D 2025 Construction Insurance Requirements.pdf.pdf234 KBNot yet available
- Exhibit J PUR-466_Proposal Certifications_r5_10.14.25.pdf.pdf476 KBNot yet available
- Exhibit Q Business Visitor Registration Instructions and Directions-MinosRoof_MasonryWall.pdf.pdf157 KBNot yet available
- Attach A 6-7-126_SOW_Minos Roof_High Bay_wall repair_v5.pdf.pdf503 KBNot yet available
- Exhibit L General Decision No IL20260008 Mod2_2026_0518.pdf.pdf482 KBNot yet available
- Exhibit O 6-7-126 MINOS HIGH BAY ROOF_MASONRY WALL REPAIR_drawing set.pdf.pdf9.2 MBNot yet available
- Exhibit F Payment Bond FL-42_FFDG.pdf.pdf737 KBNot yet available
- 2.0 Price Proposal Form_Final_fill-ins.pdf.pdf125 KBNot yet available
- 1.0 Request for Proposal_ISD_384202_DA.pdf.pdf320 KBNot yet available
- Exhibit H Fermilab Subcontractor Safety Information Questionnaire.pdf.pdf956 KBNot yet available
- Exhibit G Performance Bond FL-40_FFDG.pdf.pdf743 KBNot yet available
- Exhibit K SARC_Subcontractor Annual RepsCerts Rev 8.pdf.pdf476 KBNot yet available
- Exhibit E Bid Bond FL-41.pdf.pdf749 KBNot yet available
- Exhibit N FL-61 (Rev. 1-07).pdf.pdf112 KBNot yet available
- Exhibit R Fermilab Site Map-MINOS.pdf.pdf3.0 MBNot yet available
- Exhibit M Sample FFP Subcontract.pdf.pdf182 KBNot yet available
- Exhibit I SF1413_fill-ins.pdf.pdf181 KBNot yet available
- Attach B 6-7-126_MINOS HB ROOF REPLACEMENT_PROJECT MANUAL_260803.pdf.pdf3.5 MBNot yet available
- Exhibit P Summary of Required Solicitation Documents.pdf.pdf174 KBNot yet available
Contacts
- damico@fnal.gov6308403207
Similar contracts
- FRC Ground Level HVAC and Roof ReplacementTexasDue Sep 9, 2026
- 573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMCFloridaDue Sep 9, 2026
- Replacement of Conference Room, and Command Suite WindowsAlaskaDue Sep 9, 2026
- FCI Seagoville Hot Water Generator ReplacementTexasDue Sep 16, 2026
- MAHG 17-1095 Stennis HallMississippiDue Sep 9, 2026
- Z--DENA 332037 Eielson Roof ReplacementDue Oct 1, 2026