Install Utilities - RV Campground Site - Rock Island Arsenal
- Response deadline
- Aug 24, 2026 Due in 7 days
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
The Army Contracting Command – Rock Island is issuing this pre-solicitation synopsis for W519TC-26-R-A072. This pre-solicitation synopsis is notice regarding the Install of Utilities for RV Campground Site located on the Rock Island Arsenal, Rock Island, IL. The solicitation is anticipated to be forthcoming and will have all the necessary documents. Please see the attached Scope of Work (SOW) PR 2023-0742 for detailed project requirements. This requirement will be a 100% total small business set-aside. Performance and Payment Bonds are required. Project Summary – This project consists of furnishing labor, equipment, and material to install utilities for a new RV Campground Site. The work includes the installation of an 8" HDPE water main with a fire hydrant, a 1" poly gas main with a meter, and a 13.8 KV overhead electrical feed to a 750 KVA transformer. The scope also includes excavation and the repair of existing surfaces to match the original condition. Please monitor SAM.gov for the official solicitation, which will provide detailed project requirements, specifications, and drawings.
Classifications
Documents (1)
- Statement of Work_Install Utilities for RV Campground Site (26JUN2026).pdf.pdf304 KBNot yet available
Contacts
Similar contracts
- Y--LAKE - REPLACE HORSEPOWER COVE LIFT STATIONDue Aug 24, 2026
- Y--EAST CANAL EFFICIENCY IMPROVEMENTSDue Aug 31, 2026
- RFQ 15B61026Q00000002 - MCC San Diego - Replace Water Distribution Pumps - B&F 26Z6AK7CaliforniaDue Aug 22, 2026
- Stormwater Management Systems Replacement- HamptonDue Aug 26, 2026
- Water Supply Storage System Bazum Village, Armenia (Design-Build Construction)Due Sep 8, 2026
- Well 4 PFAS/PFOA UpgradeSouth CarolinaDue Sep 8, 2026