CES Expansion UPS Upgrade
- Response deadline
- Aug 25, 2026 Due in 13 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
*Edit 8/12/26 - added Slides and Minutes from Pre-Quote Conference and Site Visit.* The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. SITE VISIT - 11 AUG 2026 @ 1300. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system. Key scope items include: Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard. Site and electrical preparation for the new system. Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion). Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings. Full system adjustments, load balancing, and operational testing by factory-trained field service personnel. Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP). See Solicitation for additional information.
Classifications
Documents (25)
- DownloadIMG_8292.jpg.jpg447 KB
- DownloadIMG_1288.jpg.jpg141 KB
- DownloadIMG_1297.jpg.jpg25 KB
- DownloadSite Visit - Meeting minutes.pdf.pdf122 KB
- DownloadSOW - CES Expasnsion Upgrade.pdf.pdf278 KB
- DownloadSolicitation - W91SMC26QA016.pdf.pdf6.3 MB
- DownloadIMG_4541.jpg.jpg134 KB
- DownloadIMG_1289.jpg.jpg12 KB
- DownloadIMG_1290.jpg.jpg17 KB
- DownloadIMG_8290.jpg.jpg634 KB
- DownloadIMG_1294.jpg.jpg104 KB
- DownloadIMG_4544.jpg.jpg121 KB
- DownloadIMG_4692.jpg.jpg80 KB
- DownloadExisting B8 - Electrical Drawings.pdf.pdf4.7 MB
- DownloadIMG_4542.jpg.jpg97 KB
- DownloadIMG_8293.jpg.jpg625 KB
- DownloadIMG_1295.jpg.jpg120 KB
- DownloadSite Visit - Sign-in sheet 8-11-2026.pdf.pdf62 KB
- DownloadIMG_4693.jpg.jpg74 KB
- DownloadIMG_4545.jpg.jpg142 KB
- DownloadIMG_8291.jpg.jpg666 KB
- DownloadSF 1705 -Consent for Background Check.pdf.pdf1.5 MB
- DownloadIMG_8294.jpg.jpg302 KB
- DownloadSBSA Pre-RFQ Slides - 183 WG .pptx.pptx307 KB
- DownloadIMG_1287.jpg.jpg113 KB
Contacts
Similar contracts
- CHANCERY BATHROOM MODERNIZATIONBogotáDue Sep 1, 2026
- Design-Build Warehouse Construction Services, U.S. Embassy Kolonia, Federated States of MicronesiaPohnpeiDue Sep 10, 2026
- Fort Campbell Air Traffic Control Tower Due Aug 25, 2026
- INDUSTRY DAY AND MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale-Hollywood International AirportFloridaDue Aug 27, 2026
- Sources Sought Notice_IMCOM Playgrounds SATOCDue Aug 26, 2026
- N33191-26-R-0032 D-B Maritime Center of Excellence Phase III TunisiaDue Sep 11, 2026