CES Expansion UPS Upgrade
- Response deadline
- Aug 25, 2026 Due in 29 days
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. SITE VISIT - 11 AUG 2026 @ 1300. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system. Key scope items include: Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard. Site and electrical preparation for the new system. Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion). Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings. Full system adjustments, load balancing, and operational testing by factory-trained field service personnel. Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP). See Solicitation for additional information.
Classifications
Documents (22)
- IMG_8292.jpg.jpg447 KBNot yet available
- IMG_1288.jpg.jpg141 KBNot yet available
- IMG_1297.jpg.jpg25 KBNot yet available
- SOW - CES Expasnsion Upgrade.pdf.pdf278 KBNot yet available
- Solicitation - W91SMC26QA016.pdf.pdf6.3 MBNot yet available
- IMG_4541.jpg.jpg134 KBNot yet available
- IMG_1289.jpg.jpg12 KBNot yet available
- IMG_1290.jpg.jpg17 KBNot yet available
- IMG_8290.jpg.jpg634 KBNot yet available
- IMG_1294.jpg.jpg104 KBNot yet available
- IMG_4544.jpg.jpg121 KBNot yet available
- IMG_4692.jpg.jpg80 KBNot yet available
- Existing B8 - Electrical Drawings.pdf.pdf4.7 MBNot yet available
- IMG_4542.jpg.jpg97 KBNot yet available
- IMG_8293.jpg.jpg625 KBNot yet available
- IMG_1295.jpg.jpg120 KBNot yet available
- IMG_4693.jpg.jpg74 KBNot yet available
- IMG_4545.jpg.jpg142 KBNot yet available
- IMG_8291.jpg.jpg666 KBNot yet available
- SF 1705 -Consent for Background Check.pdf.pdf1.5 MBNot yet available
- IMG_8294.jpg.jpg302 KBNot yet available
- IMG_1287.jpg.jpg113 KBNot yet available
Contacts
Similar contracts
- 549 CTS - PKA - WT17959925 - Renovate Bldg. 2340Due Aug 26, 2026
- Greenhouse Phase V Renovation (Fargo, ND)NDDue Aug 6, 2026
- 549 CTS - PKA - WT17959925 - Renovate Bldg. 2340Due Aug 26, 2026
- Retamal Dam Building and GeneratorTXDue Aug 4, 2026
- FY25 MCA PN76898 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, HawaiiDue Aug 7, 2026
- Z2DA--570-20-308 - Replace and Expand Chilled Water Infrastructure in Building 1 | Construction Services ProcurementCADue Jul 31, 2026