chicago_eproc1202668B
Open
ESWPP Low Lift Pump Bldg, Chemical Bldg, and Garage Roof Replacement
- Response deadline
- Dec 18, 2026 Due in 66 days
- Date posted
- Oct 13, 2026
- Source
- Open notice
Description
Pre-Solicitation Conference (Strongly Suggested) on 03-Nov-2026 10:00:00 at Sawyer Water Purification Plant: 3300 E Cheltenham Pl, Chicago, IL 60649 - Administration Building, Second Floor, Auditorium. All Attendees must pre-register to participate. Interested Attendees must email Osha Brownlee at OshaBrownlee@cityofchicago.org, with a list of requested attendee names; Email Subject: Pre-Bid Conference for Specification#1202668B ESWPP Low Lift Pump Building, Chemical Building, and Garage Roof Replacement
Documents (1)
- 77391.pdfapplication/pdf36.8 MBNot yet available
Similar contracts
- Southwest Pumping Station Tunnel Connection (Swps-Tc)ILDue Nov 17, 2026
- Southwest Pumping Station Tunnel Connection (Swps-Tc)ILDue Nov 17, 2026
- Southwest Pumping Station Tunnel Connection (Swps-Tc)ILDue Nov 17, 2026
- Lignite Coal Based Powdered Activated CarbonILDue Nov 20, 2026
- Lignite Coal Based Powdered Activated CarbonILDue Oct 14, 2026
- Block Level Lead Service Line Replacement (LSLR) Project: W. EastwoodILDue Oct 6, 2026