il_dot_wctb091-78B55
Open
091-78B55
- Response deadline
- Sep 18, 2026 Due in 33 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
This project has 5 locations. Location 1: Resurfacing and ADA upgrades on Old 13 (Murphysboro Road) from Tower Road to New IL 13 in Carbondale; Location 2: Resurfacing and ADA upgrades on IL 127 / Old 13 from Old Brick Road to the Big Muddy River Bridge; Location 3: Pavement replacement on IL 127 / Old IL 13 from the Big Muddy River Bridge to Shomaker Drive in Murphysboro; Location 4: Pavement replacement at the intersection of IL 127 / Old IL 13 and Shomaker Shomaker Drive in Murphysboro; Location 5: Resurfacing and ADA upgrades on IL 127 / Old IL 13 from Shomaker Drive to IL 149 in Murphysboro.
Documents (2)
- 091-78B55-plans.htmltext/html; charset=UTF-8470 BNot yet available
- 091-78B55-pay-items.csvtext/csv12 KBNot yet available
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806