Material Handling & Rigging Services
- Response deadline
- Aug 27, 2026 Due in 15 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
INTRODUCTION Battelle Energy Alliance, LLC (BEA) Management and Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors capable of providing material handling, rigging, and transport services for the National Reactor Innovation Center’s (NRIC) advanced nuclear microreactor testing program. BACKGROUND INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The NRIC advanced reactor testing program requires specialized support for moving reactors and related equipment at the Materials & Fuels Complex (MFC) and other INL facilities, including the DOME testbed. BEA anticipates awarding a Blanket Master Contract (BMC), with individual task orders issued over FY2027-FY2032. SCOPE OF WORK Work may occur at the subcontractor’s facility and/or at INL/MFC, depending on the task. Responding vendors must have experience with heavy rigging and critical lifts (350 tons / 40 ft, all axes), have the ability to operate equipment remotely for high-radiation work, be familiar with ASME and DOE lifting/rigging standards, have a quality assurance program comparable to ASME NQA-1, and have equipment rated for extreme temperatures (-47°F to 105°F). The scope of work will include the following Develop lift plans, engineering calculations, and safety procedures for each reactor move. Install and operate specialized handling equipment (hydraulic slides, powered skates, turntables, rigging, spreader bars, etc.). Transport reactors and components – up to 350 tons and 40 feet long – across INL property using cranes, SPMTs, crawler transporters, or similar. Install and remove reactors from testbed facilities, including remote operation for irradiated (high-radiation) reactors. Build mockups and perform load testing to verify equipment before use. Decontamination and radiation monitoring are not included; BEA will handle those. PROCESS This EOI is the first step in identifying interested and qualified vendors for future solicitation. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration. SUBMITTAL REQUIREMENTS Interested vendors should submit an Expression of Interest that includes the following: Company name and point of contact A summary of relevant experience (heavy rigging, nuclear/radiological work, critical lifts) Confirmation of ability to meet the tonnage and size requirements above NQA-1 certification, quality program documentation, and compliance with federal procurement requirements Lead times and renewal processing capacity NAICS and business size classification Confirmation of ability to comply with INL data control requirements High-level cost estimation for renewal services Deadline for submission: August 26, 2026 Submit to: Chase.Egbert@inl.gov Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation. PROPRIETARY INFORMATION Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.
Documents (1)
- DownloadMaterial Handling EOI.pdf.pdf203 KB
Contacts
Similar contracts
- Technology Licensing Opportunity: Room-Temperature Electrochemical Metallization of Rare Earth ElementsIdahoDue Nov 15, 2026
- Available for Licensing: Fluorescent Tracer Technology for Hydrofluoric Acid Exposure DetectionIdahoDue Aug 30, 2026
- Available for Licensing: Composite Vessel-Shield Technology for Transportable Microreactor SystemsIdahoDue Sep 1, 2026
- Available for Licensing: Behind-the-Meter Energy Management Technology for Peak Shaving and Load ShapingIDDue Aug 30, 2026
- Available for Licensing: Continuous Electric-Field Assisted Sintering Technology for Scalable Continuous Material ProductionIDDue Sep 1, 2026
- Available for Licensing: Behind-the-Meter Energy Management Technology for Peak Shaving and Load ShapingIDDue Aug 30, 2026