ID FS NEZPR117 100(1), Kamiah Pierce Road Repairs
- Response deadline
- Aug 28, 2026 Closed
- Date posted
- Jul 30, 2026
- Source
- Open notice
Description
Sources Sought Request for Information 690567-26-0011 Project: ID FS NEZPR117 100(1), Kamiah Pierce Road Repairs This is a "REQUEST FOR INFORMATION" only for the proposed contract work. This is not a request for formal proposals or quotes. Plans and specifications are not available at this time. The intent of this form is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified businesses interested and capable of performing the proposed contract work. Requirement: The proposed contract action is for a firm-fixed-priced construction contract. The primary objectives of the proposed project are soldier pile wall, landslide repair, pavement preservation, sub-excavation, pavement repair, and drainage. The total project length for Schedule A is 4.9 miles and for Option X is 3.1 miles. The project is located in NEZ PERCE-CLEARWATER NATIONAL FOREST, Clearwater and Idaho Counties, Idaho The project is anticipated to go on advertisement in Spring 2027 with construction in Summer 2027 through 2028. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million. Estimated Price Range: Between $10,000,000 and $20,000,000 Response: Any offeror capable of providing this service shall respond to this sources sought by submitting the form linked to under "Attachments/Links" no later than August 28, 2026, 1400 PT.
Classifications
Documents (1)
- Link to Response FormNot yet available
Contacts
- wfl.contracts@dot.gov3606197520
- rebekah.webb@dot.gov3606197656
Similar contracts
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- Sidewalk Replacement Throughout Lyons CampusDue Oct 9, 2026
- Airfield Civil Works IDIQDue Oct 5, 2026