GAOA Const Mesa Falls Boardwalk CTNF
- Response deadline
- Aug 25, 2026 Closed
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0049 - GAOA Const Mesa Falls Boardwalk Caribo-Targhee National Forest has been posted to SAM.gov and accomplished the following: 1. Post questions and answers labeled C05a RFI QA 1240LT26Q0049. 2. Post pre-bid sign in sheet labeled C05b Site Visit Attendance 1240LT26Q0049. This SF30 must be acknowledged and submitted with your proposal. ************************************************************************************************************************************************* The work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.
Classifications
Documents (10)
- C04b Attachment 2 Mesa Falls Boardwalk Drawings 1240LT26Q0049.pdf.pdf9.1 MBNot yet available
- C04e Attachment 5 General Decision ID20260021 05182026.pdf.pdf1.8 MBNot yet available
- C04d Attachment 4 RFI Form 1240LT26Q0049.docx.docx29 KBNot yet available
- C05a RFI QA 1240LT26Q0049.docx.docx32 KBNot yet available
- C05b Site Visit Attendance 1240LT26Q0049.pdf.pdf112 KBNot yet available
- C04 SF1442 1240LT26Q0049.pdf.pdf423 KBNot yet available
- C04c Attachment 3 Mesa Falls Boardwalk SOI 1240LT26Q0049.xlsx.xlsx12 KBNot yet available
- C05 SF30 1240LT26Q0049-0001.pdf.pdf85 KBNot yet available
- C04f Attachment 6 Site Visit Info 1240LT26Q0049.docx.docx383 KBNot yet available
- C04a Attachment 1 Mesa Falls Boardwalk Specifications 1240LT26Q0049.pdf.pdf383 KBNot yet available
Contacts
Similar contracts
- LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)LouisianaDue Oct 27, 2026
- Industry Day - Selma AL Flood Management Risk and BankAlabamaDue Oct 28, 2026
- Section 219 Chesterton Interceptor Rehab
- Camp Wooten/Starbuck Levee RehabWashingtonDue Oct 30, 2026
- Sources Sought: Liberty State Park Ecosystem Restoration Project, Jersey City, NJNew JerseyDue Oct 30, 2026
- Sources Sought Wood River Relief Wells ConstructionDue Oct 28, 2026