Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
- Response deadline
- Jul 27, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
Amendment 2 Change the Solicitation Closeout Date from 07/22/2026 to 07/27/2026. Amendment 1 Change of Period of Performance from 08/28/2026 through 04/30/2027 to 08/15/2026 through 10/15/2026. See Amednment Attachment. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LU26Q0068 is issued as a Request for Quotation (RFQ) for Seed Orchard Disconnect and Electrical Life Safety Rehab. This project is to relocate the overhead power to underground power, install a new electrical disconnect, and replace pump controls at the Salmon River Seed Orchard Pump Station. The project will correct several electrical deficiencies at the Salmon River Seed Orchard Pump Station, that have resulted in hazardous conditions and equipment failures. The project would include removing existing overhead power, weather head, and pole and replacing it with new underground service to new Type 4, 400A, 480V, 3 phased disconnect switch and post. Removing existing electrical backboard and replacing with new pumpstation mounting assembly suitable for three NEMA Type4 Motor Control Centers. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237130 Power and Communication Line and Related Structures Construction The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Performance & Payment Bonds (FAR 52.228-15): Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections are required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award. Provide quote by: No later than 22 July 2026 by 12:00 P.M. (Mountain Time). DOCUMENTS TO RETURN: The following documents shall be submitted by the quoter for evaluation to be considered responsive: • 1- Combined Synopsis Solicitation Commercial Construction (SF 1442 Page 2 filled out). • Schedule of Items • Attachment 7 - Experience Questionnaire • Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable. Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9 Attn: Daniel Franco E-mail: Daniel.franco@usda.gov Organized Site Visit Site visit will be performed on 07/07/2026 at 11:00 AM MST. Per FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. Ensure you are familiar with inclement weather as this may hinder access to certain roads. For solicitation questions email daniel.franco@usda.gov. Questions are due no later than 13 July 2026 by 12:00 P.M. (Mountain Time). This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (Seed Orchard Disconnect and Electrical Life Safety Rehab, 1240LU26Q0068) as the subject line of the email.
Classifications
Documents (15)
- 1- Combined Synopsis Solicitation Commercial Construction.pdf.pdf1.6 MBNot yet available
- Appendix 2 Photos.pdf.pdf5.0 MBNot yet available
- Attachment 5- SRSO Submittal Checklist.pdf.pdf68 KBNot yet available
- Attachment 4 - Specifications.pdf.pdf463 KBNot yet available
- Attachment 9 - Questions and Answers 2.pdf.pdf51 KBNot yet available
- 1- 1240LU26Q0068 Amendment 2.pdf.pdf83 KBNot yet available
- 1- 1240LU26Q0068 Amendment 1.pdf.pdf87 KBNot yet available
- Attachment 3- Electrical Drawings.pdf.pdf3.5 MBNot yet available
- Attachment 2 - Statement of Work.pdf.pdf184 KBNot yet available
- Attachment 1 - Schedule of Items.pdf.pdf180 KBNot yet available
- Appendix 1 Map.pdf.pdf316 KBNot yet available
- Attachment 6- WD ID20260024 05182026.pdf.pdf40 KBNot yet available
- Attachment 7 - Experience Questionnaire.docx.docx38 KBNot yet available
- Attachment 8 - Questions and Answers after Site Visit.docx.docx24 KBNot yet available
- Site Visit Attendance Sheet.docx.docx15 KBNot yet available
Contacts
Similar contracts
- AMIS DIABLO EAST RADIO TOWERTexasDue Sep 4, 2026
- Request for Information - Sentinel Utility Infrastructure, Malmstrom Air Force Base, MTMontanaDue Aug 28, 2026
- SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANAMontanaDue Sep 24, 2026
- Y--Stegall Substation Stage 07 Phase 01Due Aug 28, 2026
- Y--Glendo-Lusk Rural Tap and Quinn Creek SubstationDue Aug 21, 2026
- Luke AFB AUX Airfield ModernizationArizonaDue Aug 31, 2026