Lincoln Lift Station Project - Package 1 - Lift Station Construction
- Response deadline
- Sep 4, 2026 Due in 47 days
- Date posted
- Jul 15, 2026
- Source
- Open notice
Description
The City of Caldwell is requesting statements of qualifications for the Lincoln Lift Station Package 1 - Lift Station Construction Project. The Project generally consists of an entire site built lift station including: structural cast-in-place concrete construction, site work, dewatering, masonry, metal fabrication, electrical components of entire pump station, electrical controls & monitoring devices, internal communications, HVAC/ventilation of pump station, stand-by generator, all associated pumps, site piping, internal lift station piping, valving, odor control system, applicable taxes, permits, site restoration, and SCADA controls to be properly connected with the City’s Wastewater Treatment Plant. This Request for Qualifications (“RFQ”) is intended to be administered in compliance with Idaho Code section 67-2805.
Documents
No documents posted for this opportunity.