GAOA Sam Owen Campground Improvements, Idaho Panhandle National Forest
- Response deadline
- Jul 8, 2026 Closed
- Date posted
- Jun 25, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0071 is issued as a Request for Quotation (RFQ) for the Sam Owen Campground Improvements on the Idaho Panhandle National Forest. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237990 . The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency. 6/25/26: Amendment 01 Posted. Summary - Site visit information and Questions/Answers, due date for quotes extended to 7/8/26.
Classifications
Documents (6)
- DownloadAttachment 5 - DBA WD ID20260040 Bonner Co 051826.pdf.pdf1.8 MB
- DownloadAttachment 3 - FSSS Sam Owen Campground.pdf.pdf1.4 MB
- DownloadAmendment 01 Sam Owen CG.pdf.pdf379 KB
- DownloadAttachment 4 - Signed Plans Sam Owen Campground.pdf.pdf29.8 MB
- DownloadAttachment 2 - SOI Sam Owen Campground.xlsx.xlsx28 KB
- DownloadAttachment 1 - Solicitation Sam Owen CG Improvements.pdf.pdf988 KB
Contacts
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026