SAM.gov1240LT26Q0049
Open
GAOA Const Mesa Falls Boardwalk CTNF
- Response deadline
- Aug 25, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
The work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.
Classifications
Documents (7)
- C04b Attachment 2 Mesa Falls Boardwalk Drawings 1240LT26Q0049.pdf.pdf9.1 MBNot yet available
- C04e Attachment 5 General Decision ID20260021 05182026.pdf.pdf1.8 MBNot yet available
- C04d Attachment 4 RFI Form 1240LT26Q0049.docx.docx29 KBNot yet available
- C04 SF1442 1240LT26Q0049.pdf.pdf423 KBNot yet available
- C04c Attachment 3 Mesa Falls Boardwalk SOI 1240LT26Q0049.xlsx.xlsx12 KBNot yet available
- C04f Attachment 6 Site Visit Info 1240LT26Q0049.docx.docx383 KBNot yet available
- C04a Attachment 1 Mesa Falls Boardwalk Specifications 1240LT26Q0049.pdf.pdf383 KBNot yet available
Contacts
Similar contracts
- GAOA Cordova Outhouse Replacement Chugach NFAlaskaDue Oct 6, 2026
- Pointe Mouillee Confined Disposal Facility Cells 1 and 2 Fill ManagementDue Oct 20, 2026
- Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance ChannelDue Oct 13, 2026
- FY27 CCSC Entrance Channel Maintenance DredgingTexasDue Oct 9, 2026
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Oct 2, 2026
- Addendum 04 Advance Measures Mendenhall Glacier Juneau, AlaskaAlaskaDue Oct 15, 2026