Civic AI
Civic AI
Procurement intelligence
SAM.gov140L6226Q0022
Open

HVAC Repairs at Worland, WY BLM Office

Response deadline
Aug 20, 2026
Due in 4 days
Date posted
Aug 5, 2026

Description

The Bureau of Land Management (BLM) Wind River/Big Horn District Office requires HVAC system repairs to maintain a safe, efficient, and operational facility for employees and visitors. The HVAC system¿s degradation affects heating performance, damper functionality, and control system integration, necessitating corrective action to preserve mission capability and ensure compliance with BLM facility standards. This Statement of Work (SOW) defines the services required to restore proper function to the facility's HVAC system through the replacement of core components, correction of installation deficiencies, and verification of system performance within the Metasys digital control interface. The Contractor must remove and replace the existing heating coil located in the Trane air handling unit (AHU). The Contractor must field-verify all dimensions and performance characteristics before fabrication. The replacement coil must meet or exceed the original equipment specifications for capacity, flow, materials, and configuration. Specifications may be obtained from Trane manufacturing.

Classifications

Documents (3)

  • B03_Wage_Determination_2015-5407.pdf
    .pdf254 KB
    Download
  • B08_Attachment_01_-_Statement_of_Work.pdf
    .pdf163 KB
    Download
  • Sol_140L6226Q0022.pdf
    .pdf292 KB
    Download

Contacts

Similar contracts

Explore more