HVAC Repairs at Worland, WY BLM Office
- Response deadline
- Aug 20, 2026 Due in 4 days
- Date posted
- Aug 5, 2026
- Source
- Open notice
Description
The Bureau of Land Management (BLM) Wind River/Big Horn District Office requires HVAC system repairs to maintain a safe, efficient, and operational facility for employees and visitors. The HVAC system¿s degradation affects heating performance, damper functionality, and control system integration, necessitating corrective action to preserve mission capability and ensure compliance with BLM facility standards. This Statement of Work (SOW) defines the services required to restore proper function to the facility's HVAC system through the replacement of core components, correction of installation deficiencies, and verification of system performance within the Metasys digital control interface. The Contractor must remove and replace the existing heating coil located in the Trane air handling unit (AHU). The Contractor must field-verify all dimensions and performance characteristics before fabrication. The replacement coil must meet or exceed the original equipment specifications for capacity, flow, materials, and configuration. Specifications may be obtained from Trane manufacturing.
Classifications
Documents (3)
Contacts
- addison_page@ios.doi.gov3032363800
Similar contracts
- Replace Granite Basin Water Booster Pumps & Tank Floats, Prescott NFArizonaDue Sep 14, 2026
- Building 246 HVAC Duct cleaning servicesTexasDue Aug 21, 2026
- J012--NEW | CTX Fire Sprinkler Reconfiguration for Dental ExpansionTexasDue Aug 19, 2026
- Z1DA--554-26-106 Replace DW Valves.ColoradoDue Sep 16, 2026
- BELA PMIS 349326B/BUNKHOUSE SEWERDue Aug 31, 2026
- Repair Building 510 HVACGeorgiaDue Aug 19, 2026