SAM.gov26-009
Open
Sources Sought - Fuel Pit Door Removal and Replace
DEPT OF DEFENSE · HI
- Response deadline
- Jul 24, 2026 Closed
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
Requirement is to remove two fuel pit door lids, referred to here as stall A and B. The fuel pit door from stall B is to be then installed into stall A. Service must include all necessary labor and materials. Contractor must ensure safe and proper operation of fuel pit door once installed from stall B to stall A. Fuel pit doors weigh approximately 660lbs and measure approximately 30 inches wide by 78 inches long. Part is DABICO DAB-725WP.
Classifications
Documents
No documents posted for this opportunity.
Contacts
- kyle.bristow@us.af.mil808-789-3136
- robert.yanagihashi.1@us.af.mil8087893117
Similar contracts
- Design/Build Maintenance and Repair Army Reserve (MRAR) of the Charleston Armed Forces Reserve Center, Building 17001 located in Charleston (Cross Lanes), West Virginia (WV)Due Aug 24, 2026
- Design/Build Maintenance and Repair Army Reserve (MRAR) of the Charleston Armed Forces Reserve Center, Building 17001 located in Charleston (Cross Lanes), West Virginia (WV)Due Aug 24, 2026
- Z2DA--589A4-25-102, Install Dedicated Pharmacy Air HandlerDue Sep 8, 2026
- Notice of Intent to Modify FRR VI MATOC to Increase CapacityALDue Aug 10, 2026
- Z2DA--570-20-308 - Replace and Expand Chilled Water Infrastructure in Building 1 | Construction Services ProcurementCADue Jul 29, 2026
- Z--Expansion of the PIFSC Glider Lab, JBPHHDue Aug 7, 2026