SAM.govFA521526Q0038
Open
Wake Island Airfield Fiber Installation from Lightning to Weather Instruments
DEPT OF DEFENSE · Hawaii
- Response deadline
- Sep 18, 2026 Closed
- Date posted
- Sep 17, 2026
- Source
- Open notice
Description
**Uploaded revised SOW to incorporate information from the RFI's recieved. See revised SOW, RFI's and responses, updated combined solicitation/synopsis, and FY27 Passenger-Cargo Tariffs documents.** Engineer, furnish, install and test (EFI&T) 12 new Strands (St) of Single Mode (SM) blown Fiber Optic Cable (FOC) from the Lightning Vault Building (Bldg. 1603) to ATCALS Weather Instrument (no bldg. number) on Wake Island (WI). These fiber strands shall be installed in the new fiber optic distribution panels (FODPs) to be installed by the Contractor.
Classifications
Documents (8)
- FA521526Q0038 Combo Amendment 1.docx.docx64 KBNot yet available
- Solicitation - FA521526Q0038.pdf.pdf493 KBNot yet available
- RFI Responses - FA521526Q0038.docx.docx99 KBNot yet available
- FY27 Passenger-Cargo Tariffs.xlsx.xlsx31 KBNot yet available
- WIA WD 15-5693 8Sep26.txt.txt42 KBNot yet available
- Wake LV to Wx Instruments Fiber - SOW v2.docx.docx4.7 MBNot yet available
- FA521526Q0038 Combo.docx.docx64 KBNot yet available
- Wake LV to Wx Instruments Fiber - SOW.pdf.pdf11.1 MBNot yet available
Contacts
Similar contracts
- FY27 Electrical Test and CalibrationsNYDue Nov 13, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 13, 2026
- 460-24-009 CLC and Fourth Floor Patient Elopement SystemDEDue Nov 16, 2026
- 106 Ce Electrical Loop RepairDue Nov 10, 2026
- Project No. 583-22-106- Replace Electrical Panels & Expand DistributionDue Dec 9, 2026
- Tri-Annual PM & Testing of Switch Gears - Base YearDue Nov 12, 2026