USCGC Midgett Manlift Rental
- Response deadline
- Aug 14, 2026 Due in 3 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
Statement of Work Manlift Rental for USCGC MIDGETT SMP2 FY26 USCG Purchase Request 52000PR260027191 Item 1: 1. Purpose and Scope Request to rent a 135’ Articulated Boom Lift 4WD DSL from 10AUG26-18SEP26 2. Deliverables and Performance Requirements 135’ Articulating Boom Lift for use by MIDGETT personnel During MIDGETT SMP2 FY26. 3. Period of Performance 18AUG26-18SEP26 4. Location and Method of Performance Base Honolulu 400 Sand Island Access Rd, Honolulu, HI 96819-2269 US Delivery and pickup of 135’ boom lift expected. 5. Roles and Responsibilities Contractor will deliver a 135’ articulating boom lift to 400 Sand Island Access Rd, Honolulu, HI 96819-2269 US At the beginning of the period of performance. 6. Acceptance Criteria A fully functional 135’ articulating boom crane in accordance with all manufacturers specification and safety devices 7. Security and Confidentiality Coordinate drop off with Base Honolulu POC: Walter.B.Knox@uscg.mil LRE Port Engineer 400 Sand Island Pkwy Honolulu, HI. 96819-4326 Teams/DIPS: (571) 607-8704 Cell: (562) 386-1600 8. Reporting Requirements Any deviation from contract requires Contracting Officer approval. 9. Legal Compliance Delivered 135’ articulating boom crane shall comply with all local, state, and federal environmental laws regulating articulating boom cranes at location. 10. Performance Monitoring 135’ articulating boom crane shall be fully operational through the duration of the period of performance. Item 2: Ship to: ATTN: Walter.B.Knox@uscg.mil LRE Port Engineer 400 Sand Island Pkwy Honolulu, HI. 96819-4326 Teams/DIPS: (571) 607-8704 Cell: (562) 386-1600
Classifications
Documents (1)
- DownloadMidgett Manlift SOW.pdf.pdf316 KB
Contacts
Similar contracts
- LPD-18 No.3 SSDG Crankshaft FR and RR Seal; replaceNagasakiDue Aug 27, 2026
- LHA-7 NO ONE JP-5 SERVICE PUMP AND MOTOR REPAIRNagasakiDue Aug 27, 2026
- LPD-18 Scuttle 1-21-2 in Forecastle Deck replaceNagasakiDue Aug 19, 2026
- LHA7 Eye Wash and Associated Equipment in 03-71-1-Q installNagasakiDue Aug 19, 2026
- LHA-7 Fan Room and Vent Plenum in 02-114-2-Q; refurbishNagasakiDue Aug 28, 2026
- 47--FLAT BELT,EXPANSIONDue Aug 21, 2026