Intrusion Detection System Install - BLDG SB-B1500, FS- B220
- Response deadline
- Sep 5, 2026 Due in 14 days
- Date posted
- Aug 22, 2026
- Source
- Open notice
Description
DESCRIPTION OF SERVICES: Contractor shall provide personnel, management, tools, equipment, parts and materials, transportation and other items and services necessary to perform on-site for the Physical Security project. Located at Building’s 1500 Schofield Barracks, 220 Fort Shafter, 6042, East Range Schofield Barracks, Hawaii. Contractor will install an Access Control system (AC) system at all locations. Services shall be performed in accordance with commercial practices and in accordance with the standard Security Identification Cards and Badges and Controlled Access Areas as defined in DoDI 5200.08 and AR 190-13. SECRET SECURITY CLEARANCE REQUIRED (REFERENCE PWS PAGE 3, SECURITY REQUIREMENTS) SITE VISIT: Fort Shafter Building 220 on Friday 21 AUG at 0845 Schofield Barracks Building 1500 on Friday 21 AUG at 1045 FAR 52.237-1 SITE VISIT - Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. ENSURE YOU HAVE BASE ACCESS.
Classifications
Documents (2)
- 30th Sig Bn AECS Bldg Layouts 1500 and 220.pdf.pdf2.1 MBNot yet available
- 8. FY26 SOW PWS Acces Control B1500 B220 27 MAR26.pdf.pdf174 KBNot yet available
Contacts
Similar contracts
- Video Security Camera Repairs and MaintenanceWest VirginiaDue Sep 4, 2026
- (102) Vindicator MaintenanceMassachusettsDue Aug 24, 2026
- BPAs for Security, Access Control and Bldg MgmntDue Aug 28, 2026
- DFAC Bldg. 780 Fire Alarm System ModernizationHawaiiDue Aug 27, 2026
- Melrose Air Force Range - Range Surveillance SystemNew MexicoDue Aug 31, 2026
- Building 179 Access Control System Replacement and Intrusion Detection System UpgradeCaliforniaDue Sep 2, 2026