611 CES Wheeler B310 Fire Suppression System Testing
- Response deadline
- Sep 24, 2026 Due in 2 days
- Date posted
- Sep 23, 2026
- Source
- Open notice
Description
The objective of this contract is to secure certified technical services to troubleshoot the FACP, perform all lapsed ITM cycles, repair identified deficiencies, and fully recertify the system. All inspection, testing, maintenance, and repair of the fire suppression and detection systems shall be performed in strict accordance with DAFMAN 91-203, Chapter 6 (Fire Protection and Life Safety), and UFC 3-601-02 (Fire Protection Systems Inspection, Testing, and Maintenance). The primary fire suppression and alarm systems for Building 310 at Wheeler Air Force Station are currently out of compliance. A recent Fire Department assessment identified that Sprinkler Inspection, Testing, and Maintenance (ITM) has not been accomplished since 2016, and the Fire Alarm Control Panel (FACP) ITM has lapsed and is actively displaying a "trouble" status. Quotes are due by 8:00 AM HST September 24, 2026. Reference the attached documents for Amendment 0001; 1. Performance Work Statement Amendment 0001 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. SF1449 7. SF 30 8. RFQ Amendment 0001 Point of contact: Contracting Specialist: A1C Michael R. Perreira michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree thomas.hembree@us.af.mil 808-789-3170
Classifications
Documents (8)
- ATTCH 6 - SF1449.pdf.pdf481 KBNot yet available
- ATTCH 5 - Itemized Price List.xlsx.xlsx20 KBNot yet available
- ATTCH 2 - Provisions and Clauses.pdf.pdf28 KBNot yet available
- ATTCH 7 - SF 30.pdf.pdf379 KBNot yet available
- ATTCH 1 - Performance Work Statement- AMENDMENT 0001.pdf.pdf155 KBNot yet available
- ATTCH 8 - RFQ - AMENDMENT 0001.pdf.pdf267 KBNot yet available
- ATTCH 3 - Additional Clauses.pdf.pdf78 KBNot yet available
- ATTCH 4 - SCA Wage Determination 2015-5689_Rev30.pdf.pdf4.2 MBNot yet available
Contacts
Similar contracts
- CCTV and Intercom SystemOregonDue Sep 28, 2026
- Security Camera Refresh and ModernizationNebraskaDue Sep 25, 2026
- BAFS CCTV ReplacementHawaiiDue Sep 24, 2026
- Corrective and Preventative Maintenance of Electronic Security Systems at the Ronald Reagan BuildingDistrict of ColumbiaDue Oct 8, 2026
- USFS, Corvallis Forestry Sciences Lab (CFSL) Annual Inspection of Fire Alarm System and Fire Sprinkler SystemOregonDue Sep 24, 2026
- Base Seattle Fire Alarm Confidence TestingWashingtonDue Sep 28, 2026