Civic AI
Civic AI
Procurement intelligence
SAM.gov140P2026R0091
Open

HAVO 326181 Rehabilitate Rainshed&Water Treatment

Response deadline
Oct 23, 2026
Due in 35 days
Date posted
Sep 18, 2026

Description

HAVO 326181 Rehabilitate Rainshed & Water Treatment System located at Hawaii Volcanoes National Park, Volcano, Hawaii

Classifications

Documents (15)

  • B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf
    .pdf30.6 MBNot yet available
  • Sol_140P2026R0091.pdf
    .pdf645 KBNot yet available
  • B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf
    .pdf2.1 MBNot yet available
  • B08_Att_(12)_GenRefs.docx
    .docx28 KBNot yet available
  • B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf
    .pdf14.2 MBNot yet available
  • B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf
    .pdf143 KBNot yet available
  • B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf
    .pdf2.3 MBNot yet available
  • B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdf
    .pdf133 KBNot yet available
  • B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf
    .pdf3.6 MBNot yet available
  • B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf
    .pdf39.1 MBNot yet available
  • B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf
    .pdf16.0 MBNot yet available
  • B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx
    .xlsx210 KBNot yet available
  • B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf
    .pdf1011 KBNot yet available
  • B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx
    .docx342 KBNot yet available
  • B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf
    .pdf323 KBNot yet available

Contacts

Similar contracts

Explore more