SAM.govW912ES26BA014
Open
Gull Lake Recreation Area Self-Contained Flush Vault Restroom
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- May 28, 2026
- Source
- Open notice
Description
CONSTRUCTION PROJECT TO SUPPLY ALL EQUIPMENT, LABOR, PERMITS AND MATERIALS REQUIRED TO REMOVE AND DISPOSE OF THE EXISTING VAULT TOILET BUILDING, AND REPLACE WITH A NEW PREFABRICATED, SELF-CONTAINED FLUSH VAULT RESTROOM AT THE GULL LAKE RECREATION AREA IN BRAINERD, MINNESOTA.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Gavins Point Crane Rail ReplacementDue Oct 2, 2026
- Blackhawk Park Comfort StationDue Aug 24, 2026
- STOPLOG LIFTING BEAM MODIFICATION PROJECT - ColoraDue Sep 10, 2026
- Construction Airfield Blast ShieldTexasDue Aug 14, 2026
- Construction Airfield Blast ShieldTexasDue Aug 7, 2026
- Gavins Point Crane Rail ReplacementDue Aug 10, 2026