Guatemala - Hybrid Photovoltaic Solar System
- Response deadline
- Aug 14, 2026 Closed
- Date posted
- Aug 5, 2026
- Source
- Open notice
Description
The central aim of this acquisition initiative is the design and implementation of a hybrid solar system in the Office of Immigration Assistance located on the border of Valle Nuevo, Jutiapa, to guarantee operational continuity, energy efficiency and institutional sustainability in a strategic installation of the Government of Guatemala, that fulfill or exceed the requirements of the statement of work (SOW) detailed in this document. The office has an energy demand of approximately 3,000 kWh per month, mainly derived from computer systems, servers, lighting and administrative support equipment essential for immigration care and border control. Due to the critical nature of the operations carried out in this facility, it is essential to have a reliable energy system that allows services to be kept running during power outages, voltage variations or failures in the public grid. Border facilities are usually located in areas where the following may occur voltage variations, power outages, or instability of supply.
Classifications
Documents (2)
Contacts
- guatemalabids@state.gov50223540000
Similar contracts
- Micro Gin Motor Control Center UpgradeMississippiDue Oct 26, 2026
- Removal of Abandoned Telecommunications EquipmentDistrict of ColumbiaDue Oct 23, 2026
- Upgrade Fire Detection System at FDC Honolulu, HawaiiHawaiiDue Oct 28, 2026
- IDIQ Joc Total Small-Business Set-Aside for Electrical and Other Wiring Installation Projects at Various Government Facilities Located Within the Marine Corps Logistics Base Barstow, Marine CoDue Oct 28, 2026
- Air Compressor RelocationDistrict of ColumbiaDue Oct 28, 2026
- Fire Alarm Replacement IDIQVirginiaDue Oct 23, 2026