Guatemala - Hybrid Photovoltaic Solar System
- Response deadline
- Aug 14, 2026 Closed
- Date posted
- Aug 5, 2026
- Source
- Open notice
Description
The central aim of this acquisition initiative is the design and implementation of a hybrid solar system in the Office of Immigration Assistance located on the border of Valle Nuevo, Jutiapa, to guarantee operational continuity, energy efficiency and institutional sustainability in a strategic installation of the Government of Guatemala, that fulfill or exceed the requirements of the statement of work (SOW) detailed in this document. The office has an energy demand of approximately 3,000 kWh per month, mainly derived from computer systems, servers, lighting and administrative support equipment essential for immigration care and border control. Due to the critical nature of the operations carried out in this facility, it is essential to have a reliable energy system that allows services to be kept running during power outages, voltage variations or failures in the public grid. Border facilities are usually located in areas where the following may occur voltage variations, power outages, or instability of supply.
Classifications
Documents (2)
Contacts
- guatemalabids@state.gov50223540000
Similar contracts
- B118 Fire PanelOhioDue Sep 3, 2026
- Z1DA--460-26-007 | Electrical Distribution Inspection Repairs | NCO 4 Construction East (VA-26-00057558)Due Aug 19, 2026
- POWER SYSTEM GENERATOR & TRANSFER SWITCHES REPLACEDue Aug 28, 2026
- Removal and Replacement of Dishwasher BLDG 20226TexasDue Aug 26, 2026
- Ft. Leavenworth Fire Alarm and Mass Notification System Upgrade, $45M, 5 Year SATOCDue Sep 15, 2026
- Dishwasher Replacement B20626TexasDue Aug 26, 2026