Modular Office Supply and Installation
- Response deadline
- Sep 25, 2026 Due in 4 days
- Date posted
- Sep 21, 2026
- Source
- Open notice
Description
Amendment 0001 - This solicitation is being amended to provide an updated Performance Work Statement. All offerers must acknowledge this amendment within their final proposals. Additionally, the Government is providing official responses to requests for information. =============================================== This solicitation is for the delivery and installation of a prefabricated, modular warehouse office at Naval Base Guam (NBG). The contract also includes the provision, assembly, and staging of interior office furnishings and climate control equipment. Naval Supply Systems Command (NAVSUP) Fleet Logistics Center (FLC) Yokosuka Site Marianas is seeking a contractor to provide all necessary labor, supervision, materials, tools, and transportation to deliver, offload, and assemble a pre-wired, insulated modular office unit within a designated warehouse at Naval Base Guam. The scope of work includes providing a complete modular office structure, along with all specified office furnishings (desks, ergonomic chairs) and wall-mounted air conditioning units. This procurement is a 100% set-aside for small businesses. The associated NAICS code is 332311 (Prefabricated Metal Building and Component Manufacturing). Place of Performance: Naval Base Guam (NBG) Set-Aside: 100% Small Business NAICS Code: 332311 Offer Due Date: September 25, 2026, 2:00 PM Japan Standard Time (JST)
Classifications
Documents (4)
- Questions and Answers.pdf.pdf73 KBNot yet available
- Solicitation Amendment - N6264926QH0500001.pdf.pdf1.8 MBNot yet available
- Att 02 Wage Determination Rev 29.pdf.pdf174 KBNot yet available
- Solicitation Amendment N6264926QH0500001 SF 30.pdf.pdf583 KBNot yet available
Contacts
Similar contracts
- Right Angle ClampDue Sep 22, 2026
- 48 SFS - VansDue Sep 21, 2026
- Modular Office Supply and InstallationGuamDue Sep 25, 2026
- 48 SFS - VansDue Sep 21, 2026
- Panel, Building, PrefDue Sep 28, 2026
- Vinyl Shelters / Sunshades-RAMP 7CaliforniaDue Sep 23, 2026