Justification for Other Than Full and Open Competition: Emergency Repairs to Glass Breakwater, Apra Harbor, Guam
- Response deadline
- —
- Date posted
- Aug 26, 2026
- Source
- Open notice
Description
Justification for other than full and open competition for a sole source contract modification to Tutor Perini Corporation-Nan Inc. A Joint Venture (TPC-NAN JV). This action is for critical and immediate emergency waterfront stabilization repairs to the Glass Breakwater at Apra Harbor, Guam. The required services are necessary to address damage sustained from Typhoon Bavi and mitigate further deterioration of this critical infrastructure. The scope of work includes, but is not limited to, bathymetric surveys, hydrodynamic modeling, rock recovery, and the procurement and placement of critical armor stone. The estimated value of this modification is $15,000,000.00. The statutory authority permitting this action is FAR 16.505(b)(2)(i)(A): the agency need for supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
Classifications
Documents (1)
- JA Typhoon Bavi Emergency Repairs_Signed_Redacted.pdf.pdf218 KBNot yet available
Contacts
Similar contracts
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter), Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging within the Vicksburg DistrictMississippiDue Oct 23, 2026
- Jacksonville Harbor Maintenance DredgingDue Dec 31, 2026
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteDue Nov 20, 2026
- Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2
- JP Murtha Float Mooring Bitts RetrofitDue Nov 5, 2026
- Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, FloridaDue Oct 23, 2026