Guatemala - Hybrid Photovoltaic Solar System
- Response deadline
- Aug 4, 2026 Due in 17 days
- Date posted
- Jul 6, 2026
- Source
- Open notice
Description
The central aim of this acquisition initiative is the design and implementation of a hybrid solar system in the Office of Immigration Assistance located on the border of Valle Nuevo, Jutiapa, to guarantee operational continuity, energy efficiency and institutional sustainability in a strategic installation of the Government of Guatemala, that fulfill or exceed the requirements of the statement of work (SOW) detailed in this document. The office has an energy demand of approximately 3,000 kWh per month, mainly derived from computer systems, servers, lighting and administrative support equipment essential for immigration care and border control. Due to the critical nature of the operations carried out in this facility, it is essential to have a reliable energy system that allows services to be kept running during power outages, voltage variations or failures in the public grid. Border facilities are usually located in areas where the following may occur voltage variations, power outages, or instability of supply.
Classifications
Documents (1)
- DownloadRFQ 19GT5026Q0047 - Hybrid photovoltaic solar system.pdf.pdf797 KB
Contacts
- Beau Garrettguatemalabids@state.gov50223540000