Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys
- Response deadline
- Oct 6, 2026 Due in 31 days
- Date posted
- Sep 4, 2026
- Source
- Open notice
Description
NOTE: A complete study proposal and proposed budget are not requested at this time. NOTE: The established CESU indirect rate is 17.5%. For any Cooperative Agreement entered into in response to this RSOI, a maximum 17.5% indirect cost rate will be paid on work covered by such agreement or any modifications thereto. Unless the agreement specifies otherwise, the basis of direct costs against which the agreement’s indirect cost rate is applied must be either the same base identified in the recipient's federally negotiated indirect cost rate agreement or, if the recipient does not have a federally negotiated indirect cost rate agreement, the Modified Total Direct Cost (MTDC) base. TITLE OF PROJECT: Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys SYNOPSIS OF PROJECT: This project will support the U.S. Army Corps of Engineers (USACE) Jacksonville District by performing Aerial Electromagnetic (AEM) surveys to understand the current spatial extent and rate of saltwater intrusion in the ground and surface waters of the southern Florida Everglades. Results will be integrated with previous survey data conducted over the last 30 years to comprehend the impacts surrounding significant critical habitat loss. Future freshwater-saltwater interface trends will then be estimated to optimize management decisions tied to restoration efforts of the degraded wetland system. PERIOD OF PERFORMANCE : The Base Period of the agreement will extend 12 months from date of award. Four 12-month Follow-on Periods are anticipated based on availability of funding. SUBMISSION OF STATEMENT OF INTEREST • Statements of Interest (SOI) are due by Noon Central Time, 06 October 2026 via email to the parties listed below. • Direct questions no later than Noon Central Time, 14 September 2026 via email to the parties listed below. Cheryl R. Vendemia Grants Specialist USACE Fort Worth District Email: Cheryl.R.Vendemia@usace.army.mil and Nicole Baker Project Manager USACE Fort Worth District Email: Nicole.D.Baker@usace.army.mil Timeline for Review of Statements of Interest: RSOIs are required to be posted on www.Grants.gov for 30 days prior to the Government making a decision and requesting full proposals. Refer to RSOI Package for complete details. Award is anticipated in Fiscal Year 2027.
Classifications
- NAICS12.005
Documents (2)
- RSOI W9126G262SOI0520.pdfapplication/pdf962 KBNot yet available
- NIST Requirement Notice Attachment to W9126G262SOI0520.pdfapplication/pdf3.7 MBNot yet available
Contacts
Similar contracts
- Wading Bird Response to Ecosystem Restoration in Southwest FloridaDue Oct 5, 2026
- Juvenile Sportfish Community and Habitat Suitability in Florida BayDue Oct 5, 2026
- American Alligators as Ecological Indicators of Everglades RestorationDue Oct 5, 2026
- Aquatic Fauna and Primary Production in the Florida EvergladesDue Oct 5, 2026
- American Crocodile Monitoring as an Indicator of Hydrologic Restoration in the Southern Estuaries for the U.S. Army Corps of Engineers, Jacksonville DistrictDue Oct 5, 2026
- Conservation and Forestry Program Support (2026-2031) for Environmental Natural Resources Management Division, Directorate of Public Works, Joint Readiness Training Center and Fort Polk, LouisianaDue Sep 14, 2026