Lantirn Automated Test Equipment (ATE) AN/AAM-80 Power Supply Test Station (PSTS) Electrical Load Bank
- Response deadline
- Aug 29, 2026 Closed
- Date posted
- Aug 4, 2026
- Source
- Open notice
Description
The purpose of this amendment 1 is to change to response due date to 29 August 2026 at 4:00PM. The purpose of this Purchase Instrument is to establish a five-year strategic contract for repair services in support of AN/AAM-80 Power Supply Test Station. This requirement is for the repair, calibration, and testing of the National Stock Number (NSN): 6150-01-385-8223KV, PN: 717720650-039, LOAD BANK, ELECTRICAL. Provides, accepts, and distributes all AC and DC voltages for NHA, Load Bank Assembly A5, 6625-01-333-9122, PN: 717720602-039 for LANTRIN Tester, POWER SUPPLY TEST STATION (PSTS) AN/AAM-80, (PROGRAM) 4920-01-141-0963, PN: 717720600-029. F-16 support, TO 33D7-6-261-13, 33D7-6-261-4, and 33D7-6-261-1. Workmanship shall be in accordance with T.O. 00-25-234, General Shop Practice requirements for repair, MIL-PRF-23377J (2), Primer Coating Epoxy, High Solids and MIL- PRF-19500N, General Specification for Semi-Conductor Devices. Assets shall be repaired in accordance with T.O. 00-25-234. The end item is the Low Altitude Navigation and Targeting for Night (LANTIRN) Automated Test Equipment (ATE) utilized to repair the LANTIRN Navigation POD on F-15E/F-16 aircraft. The Government does not own the data rights. This acquisition is set-aside for Keysight (the Original Equipment Manufacturer) or any of their Solution Partners.
Classifications
Documents (7)
- 4419925_ITMDESC_REPORT.pdf.pdf57 KBNot yet available
- TRNSPDATA_REPORT.pdf.pdf88 KBNot yet available
- PKGRQMT_REPORT.pdf.pdf70 KBNot yet available
- CDRL.pdf.pdf4.3 MBNot yet available
- PWS.pdf.pdf259 KBNot yet available
- WAGEDET.pdf.pdf4.1 MBNot yet available
- DownloadFA8517-26-R-0005.pdf.pdf1.0 MB
Contacts
Similar contracts
- Uninterruptible Power Supply St. Louis VA Medical CenterDue Oct 6, 2026
- Oxford PlasmaLab 100 tool PLC upgrade or its EquivalentNew YorkDue Oct 13, 2026
- Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)GeorgiaDue Nov 25, 2026
- Steris Service Contract | RFQ | 11/01/26-10/31/31MarylandDue Oct 12, 2026
- Isokinetic Probe and WCM2000 Probe Repair and MaintenanceOhioDue Oct 1, 2026
- STX Advanced Instrument OSMO ServiceDue Oct 9, 2026