Installation of Livestock Holding Pens and Chutes
- Response deadline
- Sep 8, 2026 Due in 18 days
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
USDA’s response to the New World Screwworm (NWS) is a top priority. Its National Detector Dog Training Center (NDDTC) in Newnan, GA, is expanding its NWS training program to strengthen USDA’s operational readiness and ensure canine teams are fully prepared for field conditions. Recent pilot activities in Texas demonstrated that NWS detector dogs must be safely acclimated to livestock environments including interactions with cattle, sheep, and goats to build the skills necessary for effective detection in real‑world settings. To support this requirement, NDDTC must maintain goats onsite as essential training aids. Establishing appropriate housing, fencing, shelter, and utilities is a foundational step to ensure the animals’ welfare, comply with applicable standards, and provide consistent access to training environments that accurately simulate operational livestock settings. The contractor shall provide all labor, materials, equipment, and expertise necessary to design, construct, and install fenced livestock enclosures, shelters, flooring, utilities, water systems, and a simulated chute‑training environment to support on‑site goat housing and NWS canine training. All work must comply with USDA facility, animal‑welfare, and safety standards and integrate with existing NDDTC infrastructure. NOTE: Quotes are required by Sept 8. Time is of the essence for this requirement as the government requires rapid delivery. The Contractor will be required to (a) commence work under this contract immediately upon receipt of the NTP, (b) prosecute the work diligently, and (c) complete the entire work ready for use by October 16, 2026..
Classifications
Documents (5)
- A04_Attachment 4_Federal Construction Wage Rates_Coweta County.txt.txt14 KBNot yet available
- A04_Attachment 1_Statement of Work.docx.docx70 KBNot yet available
- C04_12639526Q0284.docx.docx81 KBNot yet available
- A04_Attachment 3_Diagram of Covered Training Area.docx.docx37 KBNot yet available
- A04_Attachment 2_Aerial view_fencing and training area.jpg.jpg456 KBNot yet available
Contacts
- james.g.roloff@usda.gov6125907603
Similar contracts
- SLOAN FLAGPOLE DESIGN AND INSTALLATIONDue Sep 3, 2026
- 9 RW B2161 Carpet/Furniture/AsbestosCaliforniaDue Aug 27, 2026
- PIRO FABRICATE AND INSTALL HANDRAIL IAW SOWDue Sep 9, 2026
- DAKOTA PRAIRIE GRASSLANDS - Road Signage Elkhorn and Buffalo Gap Burn AreasNorth DakotaDue Sep 3, 2026
- 9 OSS (Base Ops) B1060 Carpet/Furniture/AsbestosCaliforniaDue Aug 27, 2026
- J078--Bowling Lanes Repair and Resurfacing for the Tomah VA Medical Center, Tomah, WisconsinWIDue Sep 17, 2026