FY26 L6WA18_B2390 Fall Protection
- Response deadline
- Aug 26, 2026 Due in 7 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
The Contractor shall provide all materials, parts, equipment, engineering, labor, shipping and travel necessary to provide fabrication, installation, and integration of a fall protection/fall arrest system (FAS) for C-130 programmed depot maintenance (PDM) performed in B2390 (See Table 1: Summary of Requirements), plus an option for B91 (See Table 2: Summary of Requirements). The system shall provide fall protection for maintenance operations performed on the C-130 wing, center-wing box, empennage, and horizontal stabilizer. The installed FAS shall accommodate non-stretched and stretched C-130 fuselage variants. The Government prefers one FAS that provides fall protection for both variants. The contractor shall use passive systems, such as guard rails, fall restraint, and fall arrest means in this order of government preference. The system shall not contact any aircraft components. Delivery shall include operation manuals, maintenance manuals, recommended preventive maintenance, drawings, SolidWorks models and training of 402d Aircraft Maintenance Group (AMXG) at Robins Air Force Base (AFB), Georgia... Please see PD in attachments for mor information.
Classifications
Documents (21)
- Solicitation - FA857126Q0084.pdf.pdf856 KBNot yet available
- L6WA18 CDRL A005 Quality Program Plan.pdf.pdf263 KBNot yet available
- L6WA18 CDRL A001 Status Report.pdf.pdf247 KBNot yet available
- Sarcos CDRL A009 DX-B2 Report.pdf.pdf149 KBNot yet available
- Attachment 2 - L6WA18 2390 Building Schematic-Distro A.pdf.pdf7.0 MBNot yet available
- Sarcos_CDRL_A013 XO-B3_Report.pdf.pdf146 KBNot yet available
- L6WA18 CDRL A006 EMS Training.pdf.pdf257 KBNot yet available
- Sarcos CDRL_A011_XO-B1_Report.pdf.pdf148 KBNot yet available
- L6WA18 JA 14 Jul 26 PCO Signed_Redacted.pdf.pdf413 KBNot yet available
- Sarcos CDRL A008 MUA CONOP Report 4.pdf.pdf145 KBNot yet available
- Sarcos CDRL A010 MUA CONOP Report 5.pdf.pdf143 KBNot yet available
- L6WA18 CDRL A007 EnMS Status Report.pdf.pdf255 KBNot yet available
- L6WA18 CDRL A002 CertofCom.pdf.pdf246 KBNot yet available
- L6WA18 PD 30 Jun - Basic and Option.pdf.pdf285 KBNot yet available
- L6WA18 CDRL A004 Technical Report.pdf.pdf221 KBNot yet available
- Attachment 1 - L6WA18 EXP B91 FPS T-6 Design Drawings-Distro A.pdf.pdf7.2 MBNot yet available
- L6WA18 Appendix C.pdf.pdf301 KBNot yet available
- L6WA18 CDRL A003 Technical Report.pdf.pdf228 KBNot yet available
- L7WA05 B91 Schematic.pdf.pdf6.6 MBNot yet available
- L6WA18 Safety Attach 3 EA.pdf.pdf322 KBNot yet available
- Sarcos _DRL_A012 MUA CONOP_Report 6.pdf.pdf143 KBNot yet available
Contacts
Similar contracts
- 39--TIE DOWN,CARGO,VEHIDue Aug 31, 2026
- ROTARY ENCODER, ETC.MarylandDue Aug 24, 2026
- 39--HOIST,CHAINDue Aug 31, 2026
- Modular Spreading/Lifting FrameDue Sep 3, 2026
- 39--WHEELED UNIT,ARTICUDue Aug 31, 2026
- 39--ABOVE DECK ASSEMBLYDue Aug 31, 2026