Crash 15 Power Divider
- Response deadline
- Aug 13, 2026 Due in 1 day
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Amendment 0001 - The purpose of this amendment is to add detail to Statement of Work Para 2.8, and Para 4, and attach as Attachment 1. Updated Para 2.8 and Para 4 in description below. Also, to add answers to contractor questions and attach as Attachment 2. Also attached updated 1449 as Attachment 9. Added Attachments 11 and 12 to add new vehicle photos. Updated "responses must address" section in Description below to add item 3. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This is a combined synopsis and solicitation for commercial service prepared in accordance with (IAW) the format in Revolutionary FAR Overhaul (RFO) part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a separate written solicitation will not be issued. All Offerors must be registered on the System for Award Management (SAM.gov) database to be eligible for a Department of Defense contract award. All responsible sources that submit a timely quotation shall be considered by the agency. Registration requires applicants to have a Unique Entity ID (UEI) from SAM.gov. Registration may take up to several weeks to process. Recommend registering immediately to be eligible for timely award. All prospective Offerors must go to http://www.sam.gov/ to add or update their Representations and Certifications record. This acquisition is for a competitive set aside 100% for Small Business concerns. All quotations will be evaluated according to the evaluation criteria stated in the solicitation and award will be made to the lowest priced technically acceptable (LPTA) offeror. Evaluation factors are price, technical acceptability, and past performance. The Government intends to evaluate quotes and award a contract without negotiations with Offerors. Therefore, the Offeror’s initial quote should contain the Offeror’s best terms. However, the Government reserves the right to conduct negotiations, if necessary. All References to "offer" or "offeror" in the clauses and provisions incorporated below are deemed to have the meaning of "quotation" and "quoter" respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at the time of award or starts performance. This solicitation document and incorporated provisions and clauses are those in effect through: Federal Acquisition Circular Effective 2025-06 Defense Federal Acquisition Regulation Public Notice Effective 11/10/2025 Department of the Air Force Federal Acquisition Circular Effective 10/16/2024 IAW RFO 52.219-1, the North American Industry Classification System Code (NAICS) and the small business size standard for this procurement is 811111 with a small business size standard of $9 million. The Federal Supply Classification code for this requirement is J023. 1. Description of Work: 1.1 Project Overview A repair or replacement is necessary for the Flightline Crash Firetruck 2008 P-19 Oshkosh 1,500-Gallon Aircraft Rescue & Fire Fighting (ARFF), Serial Number: 10TBKAK168S104292 power divider assembly. Specifically, the proposed work includes the removal, inspection, and repair or replacement of the Power Divider assembly to OEM standards using genuine OEM par 1.2 Technical Background and Justification for Repair/ReplacementDuring routine scheduled maintenance performed by Vehicle Maintenance personnel, a critical internal failure was identified within the vehicle's power divider. Diagnostics revealed the following discrepancies: Metallic Contamination: Upon draining Power Divider system fluid, substantial metallic shavings & debris were found adhered to the magnetic drain plug, indicating excessive wear or component disintegration. Internal Component Failure: Subsequent removal of the power divider oil pan revealed fragmented spring assemblies. Based on these findings, a complete removal, teardown, and inspection of the Power Divider is mandatory to prevent catastrophic system failure, personnel safety mishaps, and to restore the vehicle to full-mission-capable status. 1.3 Primary Objective The primary objective of this requirement is the complete restoration or replacement of the Power Divider to Original Equipment Manufacturer (OEM) standards. The Contractor shall ensure that all internal debris is cleared and that all failed, compromised components, and fasteners (i.e. bolts, screws, nuts, etc.) are replaced with genuine OEM parts to ensure the reliability of the ARFF mission-critical pumping and propulsion systems. 1.4 Vehicle & Power Divider Specifications The Power Divider specifications are as follows: Manufacturer: Oshkosh Nomenclature: POWER DIVIDER, OSHKOSH, SERVICE Part Number: 3811870 Quantity: 1 Each The Vehicle Specifications are as follows: Flightline Crash Firetruck 2008 P-19 Oshkosh 1,500-Gallon Aircraft Rescue & Fire Fighting (ARFF) VIN - 10TBKAK168S104292 Registration – 08L00862 2.1 Vehicle Transport The Contractor shall provide transportation to and from Moody AFB 31699 and the Contractor’s facility for all necessitated repairs to the power divider regarding one (1) Flightline Crash Firetruck 2008 P-19 Oshkosh 1,500-Gallon ARFF, Serial Number: 10TBKAK168S104292. ATTLA attached as exhibit 1 for shipping reference. The Customer will remove spray foam from the ARFF, and will configure the vehicle to conform with safe transportation standards. 2.1.1 Vehicle Transport (Contractor Pickup) The contractor shall provide flatbed transportation to pick up one (1) Flightline Crash Firetruck, 2008 P-19 Oshkosh Legacy 1,500-Gallon ARFF, Serial Number: 10TBKAK168S104292 vehicle from Moody AFB, Vehicle Management Compound located near buildings 977/983 and transport it to the contractor’s facility. 2.1.2 Vehicle Transport (Return Delivery) Return transportation of the repaired 2008 P-19 Oshkosh Legacy 1,500-Gallon ARFF shall be provided by the contractor upon successful completion of testing and final inspection to: Moody AFB, Vehicle Management Compound, buildings 977/983. 2.2 Battery Maintenance The Contractor shall maintain or disconnect the vehicle’s batteries for the entire duration the vehicle is onsite at the Contractor's facility to ensure good battery serviceability. Failure to maintain proper battery condition will require the Contractor to supply and install new replacement batteries at no additional cost to the Government. 2.3 Power Divider Repair/Replacement The Contractor shall remove, inspect, and repair/replace the vehicle's power divider with genuine OEM parts. The Contractor shall determine the specific parts required for the repair or replacement. This process shall include resealing the unit using Original Equipment Manufacturer (OEM) recommended sealants and torquing all bolts and nuts to strict OEM specifications. The Contractor shall replace any components that are damaged or outside of OEM tolerances with Original Equipment (OE) components; including but not limited to bolts, nuts, screws, etc. 2.4 Power Divider System Inspection The Contractor shall comprehensively inspect every component connected to the power divider system. All mating surfaces must be verified to be free of cracks, deep scoring, or other defects. Additionally, the Contractor shall inspect the internal drive gears within the power divider to ensure there is no damage, wear, or pitting on the gear teeth. Furthermore, the Contractor shall repair any threaded holes that are damaged or found to be out of specification during the repair process. 2.5 Body Panel Alignment and Installation The Contractor shall carefully remove and reinstall any body panels necessitated by the repair process. All panels must be realigned, and mounting hardware must be torqued to OEM specifications. The Contractor shall ensure that all compartment doors close, latch, and seal properly following the realignment and installation of body panels. 2.6 Hose Routing and Replacement The Contractor shall carefully remove and reinstall any hoses required to complete the repair. Upon reinstallation, all hoses shall be rerouted to their original OEM locations, properly tightened, and pressure-tested to ensure zero leakage. The Contractor shall replace, at their own expense, any hoses or fittings that are damaged, rounded, or stripped from mechanic error during the maintenance process. 2.7 Electrical Harness Routing and Functionality The Contractor shall safely disconnect, remove, and reinstall any electrical wiring harnesses required to complete the repairs. All harnesses shall be securely routed to their original OEM locations to prevent chafing or thermal damage. The Contractor shall verify the full functionality of every electrical component and system that was disconnected during the repair phase. 2.8 Over And Above Work Upon inspection, if additional items require repair or replacement – (Over and Above Work), the Contractor will submit itemized pricing, in writing, to the government before purchasing materials and before applying any additional labor. Pricing shall be categorized by labor, positions of labor, and materials. At that time, the government will evaluate if any or all additional labor and parts are needed, and will notify the Contractor how to proceed. Over and above work must be negotiated prior to performance of work and are within the scope of the contract. Refer to Clause 252.217-7000. 2.9 Post-Repair Testing and Quality Assurance Upon completion of all repairs, the Contractor shall perform comprehensive operational testing of the vehicle. The Contractor shall ensure there are no fluid or air leaks from any serviced component and verify that the pump system performs to OEM standards. The vehicle must be fully operational[JH4] and ready to be placed into immediate service upon return to Moody AFB. 2.10 Warranty Requirements The Contractor shall provide formal documentation for a comprehensive 12-month warranty covering all parts and labor associated with this repair. This warranty documentation must be signed, dated, and delivered upon completion of the vehicle. If a covered part or labor claim is initiated by the customer, The Contractor must respond to, initiate, and complete necessary repairs within ten (10) working days – setting aside any parts delays. 2.11 Lead Time Requirements Upon receipt of the vehicle, the Contractor is required to inspect the vehicle, provide Moody AFB with a repair/replacement course of action, and order necessary parts (subject to availability) within 14 calendar days. 120 days is the expectation for completion of repairs and return delivery. The Contractor shall promptly provide lead time information on status of repairs, especially if there are any delays in receiving parts or delays in delivering installation/repair requirements. 3. Deliverables: The vehicle has been restored to fully operational condition with all listed and necessary repairs completed IAW OEM standards. Contractor has performed all pre- and post- testing IAW OEM standards and ready to be placed into service. 4. Sub-Contracting: A Small-business may act as prime contractor and use an experienced Oshkosh qualified technical subcontractor to perform the specialized ARFF power-divider repair work and vehicle transportation. FAR 52.219-14 applies since this RFQ is a Small Business Set Aside. If you are subbing out more than 50 percent of the amount paid by the government for the service portion of the contract, you must use a “similarly situated” business, as in, another small business venture that also has annual revenues under $9M (per NAICS 811111). See below… 52.219-14 (e) - By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for— 52.219-14 (e)(1) - Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. RESPONSES MUST ADDRESS AND REPLY WITH THE FOLLOWING: Name, address, CAGE Code, SAM UEI, and main point of contact of your company. Provide a capability statement to show the ability to meet the requirement. Specify any and all socio-economic to which your business belongs (large business, small business, Small Disadvantaged Business, Section 8(a) etc.) If subcontracting out any of the labor, please provide Name, address, and also specify any and all socio-economic factors for that company. Provide a quote on company letterhead that shows three line line items (CLIN 0001, CLIN 0002, CLIN 0003) with pricing - due Thursday 13 August 2026, 10:00 AM EST Provide proof of insurance via Insurance Requirement Document (attached) - due Thursday 13 August 2026, 10:00 AM EST Price Schedule document (attached) completed - due Thursday 13 August 2026, 10:00 AM EST A Site Visit was completed on Tuesday, 11 August 2026 at 9:00 AM Eastern Time. All quotes with requested information shall be received by Thursday, August 13 2026 at 10:00 AM Eastern Time Send responses via e-mail to SSgt Justin De Jesus, justin.de_jesus@us.af.mil by the response date. Please identify the RFQ ID number FA483026Q0063 in the email subject line. Any questions regarding this Request For Quote can be directed to justin.de_jesus@us.af.mil or at (229) 257-2084. Attachments: Attachment 1 - Statement of Work v5 Attachment 2 - Questions and Answers Attachment 3 - Insurance Compliance Attachment 4 - Oshkosh Striker 1500 ARFF Specs Attachment 5 - Power Divider Photo Attachment 6 - Base Map Attachment 7 - Installation Access Request CS Attachment 8 – Wage Determination Attachment 9 - 1449 Attachment 10 - Price Schedule Attachment 11 - Power Divider Photo Attachment 12 - Power Divider Photo
Classifications
Documents (12)
- DownloadAttachment 6. Base Map.pdf.pdf349 KB
- DownloadAttachment 4. Oshkosh Striker 1500 ARFF Specs.pdf.pdf182 KB
- DownloadAttachment 10. Price Schedule.docx.docx18 KB
- DownloadAttachment 7. Installation Access Request CS.pdf.pdf151 KB
- DownloadAttachment 5. Power Divider Photo.jpg.jpg92 KB
- DownloadAttachment 12. Power Divider Photo.jpg.jpg60 KB
- DownloadAttachment 8. Wage Determination.pdf.pdf6.6 MB
- DownloadAttachment 11. Power Divider Photo.jpg.jpg76 KB
- DownloadAttachment 2. Questions and Answers completed.pdf.pdf155 KB
- DownloadAttachment 1. Statement of Work v 5.pdf.pdf207 KB
- DownloadAttachment 9. 1449.pdf.pdf542 KB
- DownloadAttachment 3. Insurance Compliance.pdf.pdf1.5 MB
Contacts
Similar contracts
- 6049 Motor Vehicle Accident (MVA) Repairs Anaconda JCCMontanaDue Aug 28, 2026
- J--Vehicle Repair for OJS District V
- 6049 Motor Vehicle Accident (MVA) Repairs Anaconda JCCMontanaDue Aug 28, 2026
- Military Razor (MRZR) Vehicle MaintenanceTexasDue Aug 12, 2026
- Crash 15 Power DividerGeorgiaDue Aug 13, 2026
- J--Autobody Repair RAM1500 and GMC TerrainDue Aug 24, 2026