Cable Fiber Install ATC Tower Dobbins ARB
- Response deadline
- Sep 21, 2026 Closed
- Date posted
- Sep 17, 2026
- Source
- Open notice
Description
Amendment 00003 posted Questions and Answers attached Amendment 00002 posted 1.Extended the Offer due date to 21 Sep 2026 2:00 PM Local Time 2. Add 52.222-41 to the Clauses 3. All Questions will be Answered on a subsequent Amendment Break Amendment 00001 posted Admin Changes to Section L: (1) adding the requirment to provide the last four (4) digits of SSN to pass security required for attendance to the Site visit and (2) State attendance is not required to submit Quote in response to subject RFQ Break The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform the installation of a new 12-strand, 150-foot (150ft) Single Mode (SM) fiber optic cable at the Dobbins ARB ATC Tower. This new SM fiber will replace an existing legacy multimode (MM) fiber run currently supporting the Negation of Improvised Non-State Joint Aerial-Threats (NINJA) system. Details are provided in the attached Solicitation and PWS
Classifications
Documents (7)
- WD 2015-4471 Rev 37 17 Aug 26.pdf.pdf4.0 MBNot yet available
- PWS__Dobbins_ARB_ATC_Fiber_Installation.pdf.pdf137 KBNot yet available
- FinalQuestionsandAnswersforFA670326Q0015fiberopticcableattheDobbinsARBATCTower.pdf.pdf170 KBNot yet available
- Solicitation Amendment FA670326Q00150002 SF 30.pdf.pdf409 KBNot yet available
- Solicitation Amendment FA670326Q00150001 SF 30 (1).pdf.pdf418 KBNot yet available
- Solicitation - FA670326Q0015.pdf.pdf491 KBNot yet available
- Solicitation Amendment FA670326Q00150003 SF 30.pdf.pdf403 KBNot yet available
Contacts
Similar contracts
- FY27 Electrical Test and CalibrationsNYDue Nov 13, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 13, 2026
- 460-24-009 CLC and Fourth Floor Patient Elopement SystemDEDue Nov 16, 2026
- 106 Ce Electrical Loop RepairDue Nov 10, 2026
- Project No. 583-22-106- Replace Electrical Panels & Expand DistributionDue Dec 9, 2026
- Tri-Annual PM & Testing of Switch Gears - Base YearDue Nov 12, 2026