Cable Fiber Install ATC Tower Dobbins ARB
- Response deadline
- Sep 21, 2026 Due in 5 days
- Date posted
- Sep 16, 2026
- Source
- Open notice
Description
Amendment 00002 posted 1.Extended the Offer due date to 21 Sep 2026 2:00 PM Local Time 2. Add 52.222-41 to the Clauses 3. All Questions will be Answered on a subsequent Amendment Break Amendment 00001 posted Admin Changes to Section L: (1) adding the requirment to provide the last four (4) digits of SSN to pass security required for attendance to the Site visit and (2) State attendance is not required to submit Quote in response to subject RFQ Break The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform the installation of a new 12-strand, 150-foot (150ft) Single Mode (SM) fiber optic cable at the Dobbins ARB ATC Tower. This new SM fiber will replace an existing legacy multimode (MM) fiber run currently supporting the Negation of Improvised Non-State Joint Aerial-Threats (NINJA) system. Details are provided in the attached Solicitation and PWS
Classifications
Documents (5)
- WD 2015-4471 Rev 37 17 Aug 26.pdf.pdf4.0 MBNot yet available
- PWS__Dobbins_ARB_ATC_Fiber_Installation.pdf.pdf137 KBNot yet available
- Solicitation Amendment FA670326Q00150002 SF 30.pdf.pdf409 KBNot yet available
- Solicitation Amendment FA670326Q00150001 SF 30 (1).pdf.pdf418 KBNot yet available
- Solicitation - FA670326Q0015.pdf.pdf491 KBNot yet available
Contacts
Similar contracts
- Cover, Electronic CommuDue Sep 25, 2026
- Maintenance, Inspection and Testing of Electrical PowerMissouriDue Sep 25, 2026
- Wake Island Fiber Installation from Marina to VORTACHawaiiDue Sep 18, 2026
- Amendment 0003 - Eaker Center Electrical Outlets RFQAlabamaDue Sep 18, 2026
- Time Division Multiplexing (TDM) Phone Switch RemovalWyomingDue Sep 18, 2026
- Wake Island Airfield Fiber Installation from Lightning to Weather InstrumentsHawaiiDue Sep 18, 2026