C-5 MLG Trunnion Bearing
- Response deadline
- Oct 27, 2026 Due in 73 days
- Date posted
- Jul 29, 2026
- Source
- Open notice
Description
Solicitation, C-5 MLG Trunnion Bearing NSN: 3120-00-766-2056UC Part No. 4F23832-103A The Air Force has a requirement for a depot-level re-manufacturing effort for the C-5 Trunnion Bearing. This item is a large, plain self-aligning, spherical bearing. It is the main pivot bearing used during the retraction and extension of the C-5 MLG. The anticipated re-manufacturing service will provide serviceable assets to meet yearly demand for Air Force field level and C-5 Programmed Depot Maintenance (PDM). This re-manufacturing effort will utilize a Requirements Type Contract. Contract period of performance will be five (5) years. It will consist of a one (1) year basic period and four (4) one (1) year ordering periods. To be eligible for award, offerors must be on the Government's pre-approved qualified source list OR submit a complete SAR package that meets all requirements specified in the Source Pre-Qualification Requirements document and the Performance Work Statement (PWS). The USAF anticipates the acquisition will be Full and Open Competition, Lowest Price Technically Acceptable. The Best Estimated Quantities (BEQ) for each ordering period are listed below. NSN: 3120-00-766-2056UC YEAR BEQ Basic 64 EA Ordering Period 1 64 EA Ordering Period 2 64 EA Ordering Period 3 64 EA Ordering Period 4 64 EA The Government owns the technical data package. Interested parties shall be registered in the Joint Certification Program and approved to view Export Control, and shall submit evidence of their certification in order to obtain the associated technical data packages. To obtain copies of the bidset documents, an interested vendor shall be registered in the Joint Certification Program (JCP). Interested vendors are to request copies of the bidsets by providing their CAGE number to both Alyssa Tanner (alyssa.tanner.1@us.af.mil) and Karen Beckford (karen.beckford@us.af.mil) to verify registration in JCP. Upon verification, bidset zip files will be sent via the "DOD Safe" website. To become registered in the JCP, interested vendors can do so at the following website: https://www.dla.mil/logistics-operations/services/joint-certification-program/ The RFP and attachments are included within the attachments area of this solicitation. All attachments are attached separately for convenience. All responsible sources may submit a proposal, which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and all amendments/revisions. Contact Alyssa Tanner, Contract Specialist, and Karen Beckford, Contracting Officer, for questions or clarification. Questions will ONLY be received via E-mail. Phone calls are not acceptable, and voice mail will not be answered nor returned. All questions will be answered via a Question and Answers (Q&A) document posted on SAM.gov attachment added to this posting and noted below in this description with the date it was updated. Alyssa Tanner, alyssa.tanner.1@us.af.mil Karen Beckford, karen.beckford@us.af.mil Completed Request for Proposal responses and documents are due 5:00 PM EST, 27 October 2026.
Classifications
Documents (12)
- DownloadA004 IUID Marking Activity Report -MGMT-81804A .pdf.pdf201 KB
- DownloadGFP ATTACHMENT.pdf.pdf6 KB
- DownloadFA853826R0019.pdf.pdf601 KB
- DownloadSource_Pre-Qualification_Trunnion_Bearings.pdf.pdf70 KB
- DownloadAFMC 158 Packaging Requirements.pdf.pdf73 KB
- DownloadPWS.pdf.pdf309 KB
- DownloadA002 CDM Production Report Monthly DI-PSSS-81995A.pdf.pdf212 KB
- DownloadA006 RFV SESS-80640E.pdf.pdf210 KB
- DownloadA005 ACCIDENT INCIDENT REPORT SAFT-81563.pdf.pdf199 KB
- DownloadA001 (CAV) End Item Reporting DI-MGMT-81838 27-00013 .pdf.pdf200 KB
- DownloadDD FORM 1653 Transportation Requirements.pdf.pdf90 KB
- DownloadA003 GOV. PROPERTY ANNUAL INV REPORT MGMT-80441D.pdf.pdf211 KB
Contacts
Similar contracts
- 15--INSULATION,THERMAL,Due Aug 24, 2026
- 16--HOSE ASSEMBLY,EMERGENCDue Aug 24, 2026
- 16--SHAFT,SPLINEDDue Aug 24, 2026
- 59--BRUSH SET,ELECTRICAL CDue Aug 24, 2026
- 16--BREECH ASSEMBLYDue Aug 27, 2026
- 16--MAST,HEATER DRAINDue Aug 24, 2026