AN/ALE-50A(V)1 and (V)2 systems
- Response deadline
- Aug 14, 2026 Closed
- Date posted
- Aug 3, 2026
- Source
- Open notice
Description
This requirement is for the repair of AN/ALE-50A(V)1 and (V)2 systems. The scope includes the repair of the Launcher Controller (NSN 5865-01-481-1841EW, P/N G555563-4) for the F-16 aircraft; and the 1x4 Dual Capability Launcher (DCL) (NSN 5865-01-479-2456EW, P/N G555770-2) and Integrated Multi-Platform Launcher Controller (IMPLC) (NSN 5865-01-486-5262EW, P/N 3410AS120-5 and two-way interchangeable NSN 5865-01-573-2800EW, P/N 3410AS120-6) for the B-1 aircraft. This effort establishes a UCA to ensure continued, highly flexible, and operationally responsive repair support directly aligned with the evolving needs of the United States Air Force. FAR Part 15 Procedures will be utilized. Solicitation will be available for viewing or downloading from SAM.gov website only. NO HARD COPIES WILL BE ISSUED. Restricted to: Raytheon Company, Authority: 10 U.S.C. 2304 (C) (1) or FAR 6.302 Justification: Supplies (or Services) required are available from only one or a limited number of responsible source(s) and no other type of supplies or services will satisfy agency requirements. All responsible sources may submit a capability statement, proposal or quotation, which shall be considered by the agency. Interested persons may identify their interest and capability to respond to the requirement or submit proposals. This notice of intent is not a request for competitive proposals. However, all proposals received within thirty days after date of publication of this synopsis will be considered by the Government. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. It is suggested that firms interested in subcontracting opportunities in connection with the described procurement make contact with the firm(s) listed. Foreign participation at the prime contractor level is not permitted. 5.101 Pre-solicitation notice. (c) Content. Include the following information in each pre-solicitation notice sent to the GPE:
Classifications
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Uninterruptible Power Supply St. Louis VA Medical CenterDue Oct 6, 2026
- Oxford PlasmaLab 100 tool PLC upgrade or its EquivalentNew YorkDue Oct 13, 2026
- Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)GeorgiaDue Nov 25, 2026
- Steris Service Contract | RFQ | 11/01/26-10/31/31MarylandDue Oct 12, 2026
- Isokinetic Probe and WCM2000 Probe Repair and MaintenanceOhioDue Oct 1, 2026
- STX Advanced Instrument OSMO ServiceDue Oct 9, 2026