SAM.govW9128F26QA092
Open
Garrison Project Power Plant Lift Station Repair
- Response deadline
- Sep 14, 2026 Due in 14 days
- Date posted
- Aug 31, 2026
- Source
- Open notice
Description
This requirement is for a firm-fixed-price service contract to procure commercial services and supplies for the complete repair and modernization of the sanitary sewage lift station supporting the Garrison Dam Power Plant in Riverdale, ND. The primary objective is to improve operational safety by eliminating the need for confined space entry for future maintenance. The period of performance is 180 days after contract award, with on-site work to be scheduled in a single, coordinated effort to minimize disruption to facility operations.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026