WTP SCADA and Filter Control System Improvements
- Response deadline
- Dec 3, 2026 Due in 34 days
- Date posted
- Oct 29, 2026
- Source
- Open notice
Description
This request is for a proposal to furnish all equipment, materials, and installation services to perform all services necessary for control and monitoring system improvements complete with all appurtenances and accessories to be installed at the City of Carrollton Water Treatment Plant. Currently the City¿s Water Plant operates ten conventional filters. Each filter has six individual valves; left influent, right influent, effluent, drain, wash and rewash, and a shared backwash valve for a total of 61 valves. These valves are controlled using a DeviceNet communication network and two Allen-Bradley ControlLogix PLCs with Panelview touchscreens. DeviceNet is no longer a widely used communication network and has proven more and more difficult for the city to support and maintain throughout the years. The purpose of this project is to abandon the existing DeviceNet based valve control system in lieu of simpler valve controls utilizing conventional discrete and analog wiring. Furthermore, it is the design intent that each filter will be capable of standalone control without the need of the Supervisory ControlLogix PLCs. Each filter will have its own dedicated Allen-Bradley PLC and touchscreen. Additionally, the integrator will replace the plant¿s existing SCADA system with new HMI software and computer hardware. Proposals shall include all materials, labor, applicable taxes and fees including freight to Carrollton, Georgia.
Classifications
- NAICS89087
Documents (1)
- Bid Advertisement _ WTP SCADA and Filter Cont.pdfapplication/pdf115 KBNot yet available
Contacts
- dappleby@carrollton-ga.gov(770) 830-2000
Similar contracts
- Pre-Advertisement Notice for Drum Screen Equipment Parts and Ancillary ServicesGADue Nov 26, 2026
- IWQ 132535 Flange AdaptorsGADue Jul 24, 2026
- IWQ 132117 Corporation Duo StopGADue Jun 30, 2026
- IWQ 126003 Flange AdaptorsGADue Jun 30, 2026
- RFPQ 26040 Water Treatment Facilities SCADA & PLC Upgrade & IntegrationGADue Jun 9, 2026