Wrightsburg Way Paving Improvements
- Response deadline
- Sep 9, 2026 Due in 13 days
- Date posted
- Aug 26, 2026
- Source
- Open notice
Description
Improvements along Wrightsburg Way within the City of Zebulon include edge milling of existing asphalt pavement, full-depth pavement patching, asphalt leveling, placement of 1.5-inch, 9.5 mm Superpave asphalt overlay, traffic control, striping and signage, and all labor, materials, equipment, and incidental work necessary to complete the project. Milling is limited to approx. 7-foot widths at the pavement edges adjacent to the existing gutter line, and to an approx. 15-foot length at the end of the project limits where the proposed overlay ends. The depth of milling will transition from zero inches at the existing roadway grade to a maximum depth of 1.5 inches below grade so that the endpoints of the 1.5-inch overlay will transition smoothly to existing grade, both at the gutter line and at the existing roadway at the project limits. All work shall conform to the latest edition of the Georgia Department of Transportation Standard Specifications for the Construction of Transportation Systems and applicable supplemental specifications. Pay items shall be measured and paid in accordance with the GDOT specifications associated with the item number shown in the Bid Schedule unless otherwise noted.
Classifications
- NAICS91396
Documents (1)
- 00100 Advertisement.pdfapplication/pdf262 KBNot yet available
Contacts
- ftrammel@zebulonga.us770-567-8748
Similar contracts
- RESURFACING OF VARIOUS CITY STREETSGADue Oct 19, 2026
- Lamar County 2026 LRA Project- Camp RoadGADue Sep 29, 2026
- Lamar County 2026 LMIG Resurfacing ProjectGADue Sep 29, 2026
- St. George Crossing Subdivision Project (PE24218)GADue Sep 17, 2026
- Bid 26-80-1514 Post Road South Widening - SR 9 to Kelly Mill (PI 0006915)GADue Sep 24, 2026
- 2026 Street Resurfacing ProjectGADue Sep 11, 2026