SB009-27 Ezzard Street Pavement Rehabilitation Project
- Response deadline
- Sep 24, 2026 Closed
- Date posted
- Aug 18, 2026
- Source
- Open notice
Description
The project is located on Ezzard Street in Lawrenceville, Georgia, with the project limits extending from Paper Mill Road to Shoal Creek (Approximately 1,500 LF). Formal bids will be received by the City of Lawrenceville (City) for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for removal and replacement of concrete curb and gutter, adjust/lower curb grate inlets, full width milling to a depth of 3.0 inches following repairs, placement and compaction of 2.0 inches of Permaflex/OGI asphalt paving, placement and compaction of a 1 inch surface coat consisting of 9.5 MM Superpave with lime along Ezzard Street from Paper Mill Road to the Shoal Creek culvert, 5 inch solid double yellow thermoplastic centerline striping, 5 inch solid white thermoplastic edge line striping, traffic control, shoulder grading, sodding and permanent grassing. City will perform tree removal. Georgia Department of Transportation Specifications should be referenced in this project.
Classifications
- NAICS91371
Documents (1)
- SB009_27 Inv Final.pdfapplication/pdf7.4 MBNot yet available
Contacts
Similar contracts
- State Let Maintenance Contract, Travis Co, Bridge Preventative MaintenanceTXDue Nov 3, 2026
- State Let Maintenance Contract, Gregg Co, Traffic Control ServicesTXDue Nov 3, 2026
- State Let Maintenance Contract, Mclennan Co, Base Failure Pavement RepairTXDue Nov 3, 2026
- State Let Maintenance Contract, Bexar Co, Traffic Control ServicesTXDue Nov 3, 2026
- State Let Maintenance Contract, Harris Co, Sweeping and Debris RemovalTXDue Nov 3, 2026
- State Let Maintenance Contract, Williamson Co, Small Sign ReplacementTXDue Nov 3, 2026