SB003-27 Lawrenceville Lawn Pedestrian Improvements
- Response deadline
- Aug 6, 2026 Due in 18 days
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
The work to be performed by the General Contractor and consist of but is not limited to the following major items: ¿ TRAFFIC CONTROL for both vehicular and pedestrians following the latest MUTCD and GDOT standards. ¿ EROSION CONTROL BMP¿s including mulch, temporary grassing, and sodding. ¿ SITE WORK including clearing & grubbing, remove and replace existing signs, grading and excavation. ¿ CONCRETE PAVING including construct concrete curb & gutter, construct sidewalk/plaza and ADA ramps. ¿ CRACK SEALING, SEAL COATING, AND THERMOPLASTIC STRIPING. ¿ 42¿ PAINTED HANDRAIL. ¿ REMOVABLE BOLLARDS. ¿ Site clearing. ¿ The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications. ¿ All work shall comply with all Federal, State, and local requirements and specifications. ¿ The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation, shall govern the construction of this project.
Classifications
- NAICS98863
Documents (1)
- DownloadSB0003_27Inv.pdfapplication/pdf5.2 MB
Contacts
- Chris Duncanchris.duncan@lawrencevillega.org6784076421