RFB No. 27-0006 Dragonfly Trail - River Road Segment
- Response deadline
- Sep 23, 2026 Due in 35 days
- Date posted
- Aug 18, 2026
- Source
- Open notice
Description
SPECIFICATIONS POSTED: https://columbusga.gov/finance/bid-opportunities This project consists of constructing a new trail beginning near Cascade Road in Columbus, Georgia. The trail will run south along River Road (SR 219) and continue west to the existing riverwalk at Lake Oliver Road. The project length is approximately 5,026 lf and includes a 10' wide concrete trail, pedestrian bridge, landscape improvements, stormwater improvements, and trail amenities. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, and signage. Portions of the project are located on state right-of-way. A GDOT encroachment permit has been obtained by the City of Columbus. A dbe goal of 10% has been established for this project.
Classifications
- NAICS91226
Documents (1)
- RFB27_0006.pdfapplication/pdf1.9 MBNot yet available
Contacts
- hscheuttig@columbusga.org7062253071
Similar contracts
- RFQ for the MLK Blvd - Altama Ave Bicycle and Pedestrian Trail ProjectGADue Sep 18, 2026
- PTC 25-10 Peachtree Corners Town Center OverlookGADue Sep 4, 2026
- 2026 Task Order Contract Transportation Construction Contract Package 3TXDue Aug 11, 2026
- RFP 386 - POND OVERLOOK PLATFORMSGADue Jul 27, 2026
- Norcross Greenway - LCI Shared Use Path EnhancementGADue Jun 26, 2026
- RFP No. 27-0003; On-Call Plumbing Installation and Maintenance Services (Annual Contract)GADue Sep 30, 2026